My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACTINFO DAVID MAHER, PE, QSD/QSP <br />david.maher@nv5.com Mechanical Engineer <br />949.585.0477 g <br />EXPERIENCE <br />Mr. Maher has more than 14 years of experience with various capital <br />14 years <br />improvement and utility projects. His qualifications include designing various <br />EDUCATION <br />water and wastewater projects, including mechanical, structural, civil <br />B.S. Civil Engineering <br />elements utilizing CAD software, and project coordination. He has both design <br />and construction management experience with projects, such as sewage <br />LICENSES/ <br />treatment plants that included several types of buildings like above -ground <br />CERTIFICATES <br />and underground concrete tanks, precast concrete manholes, retaining walls, <br />Civil Engineer (CA) <br />administration buildings, and tankers discharge facilities. <br />No. 86136 <br />Qualified SWPPP <br />Project Experience <br />Developer.................................................................................................................................................................................. <br />Qualified SWPPP <br />Grandview Pump Station <br />Practitioner <br />CITY OF GLENDALE DEPARTMENT OF WATER & POWER I GLENDALE, CA <br />Project Engineer. Mr. Maher is assisting in providing engineering services <br />AVAILABILITY <br />for design and construction support of the Grandview Pump Station <br />70% <br />Replacement. Our team is preparing plans, specifications and cost estimate <br />for the removal and replacement of the existing Pump and Motor No. 2 with <br />a new pump and motor. Grandview Pump Station is more than 70 years old <br />and pumps about 25 percent of the City's water supply. The main goal of the <br />project is to increase the reliability and efficiency of the facility by replacing <br />the 72-year-old Pump No. 2, which continues to experience failures. In <br />addition, NV5 is coordinating with the City's SCADA integrator to assure all <br />modifications during the design will be in line with the City's control system. <br />Leahy Avenue Well Drilling and Equipping <br />BELLFLOWER SOMERSET MUTUAL WATER COMPANY I BELLFLOWER, CA <br />Project Manager. Mr. Maher is managing our team's civil and mechanical <br />engineering design and technical specifications for the abandonment of an <br />existing well and equipping of a new high -capacity groundwater well, located <br />on BSMWC's property at 14740 Leahy Avenue. The well equipping design <br />is coordinated with the new well drilling and pump test data provided by <br />Geoscience Services. <br />Murrieta Road Booster Pump Station Replacement <br />EASTERN MUNICIPAL WATER DISTRICT I MURRIETA, CA <br />Mechanical Design Engineer. The project included a replacement of an existing <br />pump station; preparing a study for best options to operate the existing pump <br />station while constructing the new station; relocation of existing bypass piping; <br />new facility discharge piping, including pump selection, bypass piping, fittings, <br />valves and meters; chlorine and ammonia units; and chemical piping and <br />injection points. <br />Fox Street 1-MG Tank and Pipeline <br />EASTERN MUNICIPAL WATER DISTRICT I PERRIS, CA <br />V 5 Mechanical Design Engineer. The project included a 1-mg tank, inlet and <br />outlet enclosure, 2,100 LF of 12-inch steel and PVC transition main pipeline, <br />drainage piping and catch basins. <br />
The URL can be used to link to this page
Your browser does not support the video tag.