My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas of Expertise <br />Electrical Power Distribution <br />Emergency Power Systems <br />Electrical Code Compliance <br />Photovoltaic Systems <br />Lighting Design/Energy Efficiency <br />Years of Experience <br />32 Years <br />Education <br />BSEE, 1987, CSU Sacramento, <br />Electrical Engineering (Power <br />Option) <br />MBA, 1992, University of San <br />Diego, Business Administration <br />Registration/Certification <br />Registered Professional Electrical <br />Engineer — <br />California E-13353 <br />Arizona E-26739 <br />Nevada E-10297 <br />Missouri E-2015008159 <br />Idaho E-16420 <br />Minnesota E-52741 <br />LEED BD+C (US Green Building <br />Council) <br />Memberships/Organizations <br />International Assoc. of Electrical <br />Inspectors (IAEI) <br />Illuminating Engineering Society <br />(Past Chapter President) <br />IEEE Industry Application Society <br />USGBC San Diego Chapter <br />National Fire Protection <br />Association (NFPA) <br /><�D <br />BSE ENGINEERING <br />Alan J. Brown, PE, MBA, LEED AP BD+C <br />Principal Electrical Engineer <br />Overview <br />Mr. Brown, PE, has over 30 years' experience providing electrical <br />engineering services for municipal, state, and federal government <br />facilities. He has completed over 1000 projects including all types of <br />building and site infrastructure work. His experience includes site and <br />building electrical systems, lighting and lighting controls, Title 24 <br />compliance, LEED for electrical systems, telecommunications <br />infrastructure, and photovoltaic systems. Mr. Brown is a Certified Plan <br />Reviewer (International Code Council # 1027131) and Electrical Code <br />expert. <br />Project Specific Experience <br />Leahy Ave. Water Well, Bellflower Somerset Mutual Water <br />Company, Bellflower, CA <br />Principal Electrical Engineer for new pump station. Provided power, <br />interior and exterior LED lighting, controls, new electrical service from <br />SCE, and Title 24 energy compliance. Reviewed drawings, single line <br />diagrams, control schematics, and PLC cabinet. <br />Grandview Pump Station No. 2 Unit Replacement, City of Glendale <br />Water & Power Department, Glendale, CA <br />Principal Electrical Engineer for replacement of improperly functioning <br />synchronous motor with an induction motor. Reviewed drawings, <br />control scheme of existing motor, single line diagrams, and door <br />cabinet of existing equipment. <br />624 Pressure Zone — P2541 Pressure Reducing Stations #1 and #2, <br />Otay Water District, Chula Vista, CA <br />Principal Electrical Engineer for the electrical and controls upgrade to <br />existing Pressure Reducing Station #1 and #2 (624 Pressure Zone). <br />Provided design supervision and quality control reviews for the <br />electrical upgrades (new electrical service, SDG&E transformer <br />location, and connection to PRV vault) and instrumentation upgrades <br />(process & instrumentation diagram and new PLC). <br />Dictionary Hill Pump Station Motor Control Center Replacement, <br />Helix Water District, La Mesa, CA <br />Principal Electrical Engineer for the replacement of the service <br />entrance switchboard and pump station motor control center. <br />Provided design supervision and CIA reviews for MCC configuration, <br />pump control schematic, and pump re -circuiting, ATS configuration <br />and installation, and project specifications. <br />Designing Your Sustainable Future <br />
The URL can be used to link to this page
Your browser does not support the video tag.