My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<jol <br />ESE ENGINEERING <br />Erson Bolos, PE, LEED AP BD+C <br />Senior Electrical Engineer <br />Overview <br />Mr. Bolos, PE, has experience in the engineering and design of interior <br />_ <br />and exterior lighting, lighting controls, site and building electrical <br />distribution systems, load calculations, and branch circuit wiring. He <br />has focused on electrical engineering analysis using SKM <br />Dapper/Captor software, building circuiting and power distribution. <br />Areas of Expertise <br />Project Specific Experience <br />Electrical Power Distribution <br />Leahy Avenue Water Well, Bellflower Somerset Mutual Water <br />Electrical Code Compliance <br />Company, Bellflower, CA <br />Lighting Design/Energy Efficiency <br />Senior Electrical Engineer for new pump station. Provided power, <br />Years of Experience <br />interior and exterior LED lighting, controls, new electrical service from <br />14 Years <br />SCE, and Title 24 energy compliance. Created drawings, coordinated <br />with client for HVAC equipment and mechanical piping, attended site <br />Education <br />meeting w/SCE, created single line diagrams, and created control <br />BSEE, 2005, San Diego State <br />schematics and PLC cabinet. <br />University, Electrical <br />Grandview Pump Station No. 4 Unit Replacement, City of Glendale <br />Engineering <br />Water & Power Department, Glendale, CA <br />Registration/Certification <br />Senior Electrical Engineer for replacement of improperly functioning <br />Registered Professional Electrical <br />synchronous motor with an induction motor. Performed site visit to <br />Engineer, California E-19306 <br />verify existing conditions. Coordinated with client for new motor sizes, <br />LEED BD+C (US Green Building <br />with controls consultant for PLC controls, and with manufacturer of <br />Council) <br />existing switchboard for existing motor control diagram. Removed <br />synchronous portion of controls so controls work with induction <br />Memberships/Organizations <br />motor. Created drawings. Revised control scheme of existing motor, <br />Illuminating Engineering Society <br />single line diagrams, and door cabinet of existing equipment. <br />North Bay Pump Station Replacement, Lake Arrowhead Community <br />Services District, Lake Arrowhead, CA <br />Project Electrical Engineer for the replacement of the service entrance <br />switchboard and pump station motor control center. Provided control <br />schematics, SCADA, and P&IDs to denote process flow and related <br />inputs and outputs. Provided NITS and generator quick connect <br />switchboard with alternate generator logs. <br />Dictionary Hill Pump Station Motor Control Center Replacement, <br />Helix Water District, La Mesa, CA <br />Project Electrical Engineer for the replacement of the service entrance <br />switchboard and pump station motor control center. Provided design <br />supervision and CIA reviews for MCC configuration, pump control <br />schematic, and pump re -circuiting, ATS configuration and installation, <br />and project specifications. <br />Designing Your Sustainable Future <br />
The URL can be used to link to this page
Your browser does not support the video tag.