Section 4 — Relevant Project Experience
<br />Similar Project Experience and References
<br />Clients choose W&A for our responsiveness, our experience in a variety of CIP and Development projects and
<br />our staffs commitment and ability to help ensure the success of every project.
<br />On -Call Project Management, Construction Management and Inspection
<br />City of Corona, CA (May 2011 — Present)
<br />Related Elements
<br />Variety of CIP projects
<br />W&A Key Staff
<br />Contract Manager: Carl Wallace, PE
<br />PM/CM: Bryan Tuschhoff, CMIT, PMP,
<br />QSP, Peter Ramey, PE, John Reidinger,
<br />CCM, Jeff Schippers, CCM, Dennis
<br />Phinney, PE, Ken Cope
<br />Cost Estimating: Peter Ramey, PE
<br />Office Engineering: Heidi Nesper,
<br />Rachael Highley, Kim Brown, Christine
<br />Gallis
<br />Senior Construction Inspectors:
<br />David Zamiski, Tom Hall, Pete Ayala,
<br />Gordon Lewis, Pat Shen, QSP, Frank
<br />Moreno, Rick Wiggins, Bob Peters,
<br />David Babcock, Cesar Ramirez, EE,
<br />Jeremy Vander Veen
<br />Contract Admin: Heidi Nesper,
<br />Rachael Highley, Christine Gallis, Bill
<br />Eckman
<br />Certified Payroll Auditor: Kim Brown
<br />Client Contact
<br />Vernon Weisman
<br />District Engineer
<br />(951)739-4912
<br />vernon.weisman@ci.corona.ca.us
<br />W&A is providing Project Management, Construction Management,
<br />Inspection and Labor Compliance services for Development and CIP
<br />projects throughout the City. Project elements involve water and sewer
<br />pipelines, lift stations, reservoirs, streets, roadways, street lights,
<br />facilities, parks, land development and utility relocations. Relevant
<br />projects include:
<br />• Temescal Canyon Road Improvement Projects: Temescal/Glen
<br />Ivy Waterline Relocation Dawson ($13M) 2019
<br />• Sixth Street Waterline Extension -Grand to Rimpau ($863K) 2019
<br />• 2018-19 Pavement Rehabilitation Project ($1 M) 2019
<br />• Vista Monterey Recycled Waterline ($500K) 2018
<br />• Main Street Metro Development ($150M) 2018
<br />• Foothill Parkway Widening Tamarisk Lane to Teddy Bear Lane
<br />($1.75M) 2017
<br />• CIPP Sewer on Smith Street ($200K) 2015
<br />• Masters Drive Recycled Waterline and Repaving Project ($2.5M)
<br />2013
<br />• Butterfield Park Recycled Waterline ($3M) 2014
<br />• Cerritos Waterline Replacement ($1.5M) 2014
<br />• R-3 Reservoir ($4M) 2014
<br />• Arlington Desalter Connection ($850K) 2012
<br />On -Call Construction Management and Inspection Services
<br />City of Fullerton, CA (July 2018 — Present)
<br />Related Elements
<br />On -call inspection for water related
<br />services
<br />W&A Key Staff
<br />Contract Manager: Carl Wallace, PE
<br />Construction Manager: Bryan
<br />Tuschhoff, CMIT, PMP, QSP
<br />Construction Inspectors: Gary
<br />McCredie, CMIT, Bob Peters
<br />Special Inspections: Jin Chong, [CC,
<br />Client Contact
<br />David Gantham, PE
<br />Project Manager
<br />(714)738-6853
<br />DGrantham@cityoffullerton.com
<br />W&A provides On -Call Construction Management and Inspection
<br />services for a variety of Land Development and Capital Improvement
<br />Projects within the City. Projects include street rehabilitation, traffic
<br />signal and intersection, water and sewer improvements, storm drain
<br />facilities, landscaping and irrigation. Specific projects include:
<br />• Laguna Booster Pump Station Upgrades ($880K) 2019
<br />• Harbor Boulevard Rehabilitation ($175K) 2018
<br />• Valencia Drive Infrastructure Improvements ($1.5M) 2019
<br />• Chapman Avenue Rehabilitation ($950K) 2018
<br />• 4300 North Harbor Boulevard ($2.5M) 2018
<br />• Transportation Center Pedestrian Overpass Elevator ($2.7M)
<br />2018
<br />• Residential Slurry Seal & Misc. Rehab ($729K) 2018
<br />C7a11aoclates
<br />...... City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 17
<br />
|