My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WALLACE AND ASSOCIATES CONSULTING, INC-2020
Clerk
>
Contracts / Agreements
>
W
>
WALLACE AND ASSOCIATES CONSULTING, INC-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:30:25 AM
Creation date
5/6/2020 4:21:29 PM
Metadata
Fields
Template:
Contracts
Company Name
WALLACE AND ASSOCIATES CONSULTING, INC
Contract #
A-2020-076-04
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
1/17/2024
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ram, I <br />Section 4 — Relevant Project Experience <br />On -Call Construction Management and Inspection Services <br />City of Huntington Beach, CA (Oct 2018 — Present) <br />Related Elements <br />Full time CM and inspection services <br />W&A Key Staff <br />Contract Manager: Carl Wallace, PE <br />Construction Manager: Paul Allison, <br />CMIT <br />Construction Inspector: Thomas Hall <br />Labor Compliance: Heidi Nesper, <br />Christine Gallis <br />Labor Compliance Auditor: Kim Brown <br />Integration and Electrical Inspection: <br />Rockwell Construction Services <br />Client Contact <br />Joe Dale <br />City Construction Manager <br />(714)536-5915 <br />jdale@surfcity-hb.org <br />W&A is providing Construction Management, Inspection, <br />Administration and Labor Compliance services on a task order basis <br />for State -Funded, Federally -funded and non-State/Federally-funded <br />capital improvement projects. This initial three-year contract covers <br />various public works infrastructure projects including: <br />• Edgewater Sewer Lift Station Project ($4.2M) Ongoing <br />. Traffic Signal Improvements at the intersections of Main Street at <br />17th Street/Utica Avenue, and Bolsa Chica Street at Pearce Drive <br />($643K) Ongoing <br />Various Signalized Intersections ($2M) Ongoing <br />• 2019 Arterial Pavement Rehabilitation ($3.3M) Ongoing <br />Ocean View Estates (OVE) Parking Lot Expansion ($85K) 2019 <br />• Residential Overlay of Maintenance Zone 6 ($3M) 2019 <br />Various Water Infrastructure Projects <br />Inland Empire Utilities Agency, CA (Jan 2016 — Present) <br />Related Elements <br />Various CIP water improvement projects <br />W&A Key Staff <br />Contract Manager: Carl Wallace, PE <br />PM/CM: Jeff Schippers, CCM, Dennis <br />Phinney, PE, Peter Ramey, PE <br />Construction Inspectors: Jin Chong,' <br />ICC, AWS, Rick Barajas, John Alcala <br />Administration Support: Margie <br />Saldibar <br />Client Contact <br />Rachel Solis <br />Supervisor of Engineering Administration <br />(909) 993-1895 <br />rsolis@ieua.org <br />W&A provides Inspection and Constructability Review Services for <br />CIP, Development and Emergency Repair Projects. Over 45 projects <br />ranging in size and duration have been completed and include <br />distribution, treatment, and storage for domestic water, sewer, CIPP <br />and recycled water projects. Project elements include new domestic <br />and recycled pipeline replacement and installation, pump stations, <br />manhole repair, water connection upgrades, new development pipeline <br />installations, valve replacements and system upgrades. Projects <br />include: <br />• Planning Department Administration Staffing ($100K) On -going <br />• Napa Lateral Pipeline ($6M) Ongoing <br />• Cucamonga Valley Water District Regional Sewer Connection <br />($400K) <br />• San Sevaine Stormwater Basin Improvements ($6.4M) 2019 <br />• Regional Recycling Plant No. 1 Improvements—Headworks, <br />Primary and Secondary Upgrades ($10.5M) 2019 <br />• Emergency Repair Projects ($ Varies) Ongoing <br />• RP-1 Primary Effluent Conveyance Improvements Project ($4.5M) <br />2019 <br />• RP-4 Disinfection Facility Improvements ($1.8M) 2018 <br />• San Bernardino Avenue Gravity Sewer Project ($1 M) 2017 <br />C7s11ace.sAssotlates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.