Laserfiche WebLink
Paul Allison, CMIT <br />Senior Construction Manager <br />Moreno Lakeside Pipeline, San Diego County Water Authority, CA <br />Quality Assurance Inspector for five miles of new 60" concrete -lined steel water pipe, including two flow control <br />facilities, two tunnels and associated appurtenances. <br />Pipeline #3 Relining, San Diego County Water Authority, CA <br />Quality Assurance Inspector for five miles of existing 60" concrete lined steel water pipe, relined with welded <br />steel liners and concrete. <br />Encino Reservoir Water Quality Improvement Project, Los Angeles Department of Water and Power, <br />Los Angeles, CA <br />Quality Control/Non-Destructive Testing Inspector for a new pump house for the water treatment facility and <br />new piping systems for reservoir fill level control. The project also included a chlorination building made of pre- <br />fabricated metal. <br />Los Angeles Regional Transit Metropolitan Center, Caltrans and California DGS, Los Angeles, CA <br />Non -Destructive Testing Inspector/Ultrasonic Tester for structural steel for the new earthquake resistant transit <br />center for Caltrans and the California Department of General Services. <br />Catalina Pump Station, San Diego Water Authority, CA <br />Provided inspection services for a new pump house, a new power house and related piping systems. The <br />pump house was a pre -fabricated metal with a metal roof. <br />Black Mountain Road Reclaimed Water Pipeline, San Diego County Water Authority, CA <br />Quality Control/Non-Destructive Testing Inspector for four miles of new 36" concrete -lined steel water pipe for <br />reclaimed/irrigation water. <br />i^,IallaceaAssoclases City of Santa Ana i Water Resources Construction Management and Inspection Services No. 19-118 43 <br />