Laserfiche WebLink
Paul Allison, CMIT <br />Senior Construction Manager <br />Margarita Water District, City of San Juan Capistrano, Calle Perfecto Business Park, Orange County Flood <br />Control and Public Works, Orange County Transit Authority, Orange County Rail Authority, and US Army Corps <br />of Engineers. <br />Capital Improvement Program and On -Call Services, Elsinore Valley Municipal Water District, CA <br />Lead Inspector that provided inspection services for the multi -contract CIP and on -call services to improve <br />water, wastewater and recycling facilities. Responsibilities included inspection of well and reservoirs, pipelines, <br />trunk sewers, micro -tunneling and boring, water and sewer mains. Also provided services for water, sewer and <br />recycled waterlines for new housing tracts, pump stations, sewer lift stations and treatment plants. Inspected <br />work quality and materials and verified the contractor's compliance with plans, specifications, and standards. <br />Monitored extra work, verified T&M tickets, approved field changes and provided evaluations of cost and time <br />for contractor change orders. Certified all the inspection reports for the team, compiled and managed the <br />inspection files, and provided progress reports for construction and installation status. <br />Santa Ana River Interceptor Relocation and Realignment, Orange County Flood Control District, Yorba <br />Linda, CA <br />Lead Inspector over a team of five Inspectors who provided quality assurance inspections for the project <br />including a flow control facility and five miles of 54" fiberglass (FRP) pipe installed with open cut and pipe - <br />jacking methods. The team verified that the work was being performed according to specifications and <br />documented delays or other impacts to the project's schedule. The project contained 2,500' of slurry -based <br />micro -tunnel with deep manholes, two river crossings and the longest compound curve in North America at the <br />time. The pipeline segment included the installation of an inverted siphon with three 30" HDPE pipes. The <br />project took place in the Featherly County Park where several endangered and protected species of birds <br />impacted the work. Stakeholders included Orange County Flood Control District, Orange County Sanitation <br />District, Orange County Public Works, Orange County Parks, Santa Ana Watershed Project Authority, the Army <br />Corps of Engineers and Caltrans. <br />Lakeshore Trunk Sewer -North Reach, Elsinore Valley Municipal Water District, Lake Elsinore, CA <br />Lead Inspector for over three miles of new PVC -lined concrete pipe installed with traditional and slurry -based <br />micro -tunneling methods (2/3) and open cut methods (1/3). This project involved a tunnel installation next to a <br />senior center and retirement community, which involved constant interaction with the residents and property <br />managers. A new entryway and exit were built to maintain safe access for residents at all times, as well as <br />control noise and other construction nuisances. <br />Freeport Regional Water Authority Segments 3 and 4, Elk Grove, CA <br />QA Inspector provided inspection services for over one mile of 66" and five miles of 72" new concrete -lined <br />steel water pipe, including one flow control facility, a surge control facility, a terminal weir structure and <br />associated appurtenances. Inspected and verified the contractor's compliance with plans, specifications, and <br />standards, monitored extra work, and verified T&M tickets. <br />Otay Mesa Power Plant, City of San Diego, CA <br />Quality Control Inspector/Concrete Technician that provided welding, structural bolting and concrete sampling <br />inspection services for structural steel and cast -in -place concrete for a new gas turbine power plant. <br />Maintained project inspection reports and verified that materials on site were in accordance with the <br />specifications. <br />High Meadow Ranch Offsite Water Line, Lakeside Water District, Lakeside, CA <br />Quality Control/Non-Destructive Testing Inspector for 5,000' of new 24" concrete -lined water pipe for a new <br />housing development for Lakeside Water District. Responsible for welding inspection, non-destructive testing, <br />grouting, and backfill inspection of a high pressure water line in an area with extremely difficult access due to <br />the steep slopes and lack of roads. <br />Aircraft Rescue and Fire Station at Marine Corps Air Station, San Diego, CA <br />Quality Assurance Inspector for structural steel elements for a new fire station for the California Department of <br />General Services and the US Marine Corps. <br />C7allaCesassoclates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 42 <br />