Laserfiche WebLink
Jeff Schippers, CCM <br />Senior Construction Manager <br />as underground duct bank to accommodate future expansion. Monitored the construction management team <br />during the construction to ensure plans and specifications were followed and the project was delivered to the <br />owner's budget and schedule. <br />Water Reclamation Plant # 2 - Tertiary Granular Media Filters, City of Corona, CA <br />This $9.5M project added 3MGD to the reclaimed water effluent that gets pumped to percolation ponds. Work <br />included main filtration concrete structure, back wash and flocculation basins, coagulant tanks, new motor <br />control centers, pumps, piping and valving, and the construction of all support structures and pump houses. <br />Water Reclamation Facility # 2 - Headworks and Lift Station Upgrades, City of Corona, CA <br />Project Construction Manager for the $1.8M project that upgraded a Sunkist lift station. Elements included <br />taking the station of services to recoat the wet well with Sancon, removal and replacement of pumps, piping <br />and support structure, removal of an underground vault, installation of new above -grade piping and valving, <br />and construction of a support structure that allowed the piping to run above the road to tie into the headworks. <br />Work also included new biofilter, MCCs and sump termination panels. <br />Artisan Lift Station, City of Corona, CA <br />Project Construction Manager for this $1.5M project to accommodate the addition of 450 new apartments in the <br />North Main area. Project features included a new 24' wet well, lead and lag pumps, yard piping and valving, a <br />biofilter, new genset and fuel tank, MCCs, a SCADA tower, fencing and landscaping. <br />Ontario Booster Station Upgrades, City of Corona, CA <br />Project Construction Manager for this $3M project for the construction of a new pump deck above an existing <br />reservoir and repurposing the facility to better serve multiple water zones. Eight new 300HP pumps were <br />added, as well as new MCCs, VFDs, Genset, ATS, site upgrades, fencing and multiple points of connection in <br />the adjacent street. <br />Chase Booster Station Upgrade, City of Corona, CA <br />Project Construction Manager for this $200K booster station which was completely upgraded from the drive <br />approach to the structure itself. The MCCs were upgraded in the pump house and SCADA was installed. <br />Lester Treatment Plant/ Blend Station, City of Corona, CA <br />Multiple projects in this facility ($50K to $300K) to upgrade the site, structures which included new SCADA, <br />new piping and valving, flow meters, MCCs and upgrades to the chemical equipment area and recoating of the <br />filter decks and storage reservoir. <br />Well 29 and Well 31, City of Corona, CA <br />Construction Manager of two new $1.4Mwell houses including concrete slabs and bases with CMU walls and <br />conventional roofs to blend them into the neighborhoods. New 250HP pumps, MCCs, VFDs, transfer switches, <br />yard piping and SCADA; both were constructed to accommodate future gensets. <br />Temescal Desalter Reverse Osmosis Facility, City of Corona, CA <br />Construction Manager for multiple projects completed at this site including new bypass and chemical piping, <br />installation of SCADA controlled motor operated valves, structural upgrades, MCC and HVAC upgrades and <br />the conversion of existing bottling space and office space to a new training facility with a complete audio visual <br />system, new toilet facilities, kitchen area, site work and landscaping. <br />CIP Projects, City of Corona Department of Water and Power, Corona, CA <br />Construction Manager for capital improvement projects ranging from $50K to $10M Responsible for all aspects <br />of the projects including design guidance, RFI's, submittals, safety, coordination with other agencies, progress <br />meetings, change order negotiation and community outreach, preconstruction, design guidance, cost <br />estimating, managing budget and schedule, providing change order negotiations, construction supervision and <br />close out of each project. Also provided facility start-up and testing prior to turnover to city staff. The facility <br />projects included two ground -up office tilt ups of 80,000 sf and five acres of site development, several tenant <br />improvement projects valued at $1 Meach, a complete conversion of 60,000 sf office building to a Police <br />Station and the construction of a new Type 3 Jail Facility. Specific projects included: <br />• Police Department Headquarters and Jail Facility — Construction Manager for this 60,000 sf $8M <br />construction of new Police Department. Responsible for design guidance/constructability review, cost <br />C7alla..I... oclases City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 45 <br />