Jeff Schippers, CCM
<br />Senior Construction Manager
<br />22
<br />management, schedule, contract management, RFI's, submittals, bulletins, progress meetings and
<br />change order negotiations. This project consisted of the addition of an impound room, locker rooms and
<br />a storage room to the existing facility. New HVAC utilities were installed to extend air and heat services.
<br />• Fire Department Headquarters and Jail Facility — Construction Manager for this 40,000 sf $5M
<br />construction of new Fire Department. Responsible for design guidance/constructability review, cost
<br />management, schedule, contract management, RFI's, submittals, bulletins, progress meetings and
<br />change order negotiations.
<br />• Community Center — Construction Manager for the $3M conversion of the existing 72,000 sf Fender
<br />Music Museum to a new Community Center. Project included extensive structural modifications to build
<br />a full-size indoor basketball court, addition of classroom, fitness and children's areas, new finishes
<br />inside and out and an extensive integrated sound, paging and life safety systems.
<br />Corona Animal Shelter, Phase 2, City of Corona, CA
<br />Construction Manager for this $3M Animal Shelter Phase II Project. Responsible for design
<br />guidance/constructability review, cost management, schedule, contract management, RFls, submittals,
<br />bulletins, progress meetings, and change order negotiations. This project consisted of the addition of an
<br />impound room, locker rooms and a storage room to the existing facility. New HVAC utilities were installed to
<br />extend air and heat services.
<br />Corona Animal Shelter, Phase I, City of Corona, CA
<br />Construction Manager for the new $3M, 6,000 sf animal control facility with new office space, indoor and
<br />outdoor kennel space, approximately two acres of site development with new utilities and parking areas, a
<br />separate building for euthanasia and quarantine, and extensive drought tolerant landscaping and site lighting.
<br />Corporate Yard Project, City of Corona, CA
<br />Construction Manager for this $30M project which consisted of two tilt -up office buildings for a total of 80,000
<br />sq ft, both built to essential facility standards, including the Cities Emergency Operation Center and site
<br />development. Generated daily, weekly, and year-end reports for individual projects, project estimations, and
<br />overall team performance. Monitored and mentored the project staff and subcontractors to ensure safety,
<br />quality and productivity. Reported directly to the City Manager.
<br />LAX Midfield Satellite Concourse, Los Angeles, CA
<br />Construction Manager responsible for onsite field operations for all mechanical, plumbing, electrical, fire
<br />suppression and special systems. Responsible for trade coordination with all structural, civil and finish trades.
<br />The LAX MSC project is a new ground up $1.33 project. The project consists of a new terminal building west of
<br />the existing Tom Bradley terminal that includes 12 new international aircraft gates new taxi ways and a new
<br />ramp control tower. The project also includes a new LADWP 34.5 KV substation to provide power to the new
<br />MSC terminal and other LAX sites.
<br />Long Beach Municipal Airport, Long Beach, CA
<br />Construction Manager for this $70M Design/Build project which includes a new checked baggage inspection
<br />building, a new airline ticketing building, new baggage claim area, new rental car offices in the existing historic
<br />terminal building, new QTA and rental car space including fueling islands and wash stations. The project also
<br />upgrades the airport access and public transit areas as well as a new concession area and a Meet and Greet
<br />Plaza with wash rooms and back of house operational areas.
<br />Anaheim Convention Center Expansion, City of Anaheim, CA
<br />Construction Superintendent for the $118Mexpansion of the existing convention center to increase the size
<br />40% to 1, r�N sf, restoring it to one of the ten largest convention centers in the country. The expansion was
<br />more than an addition of space; it was a complete transformation of the convention center's single story, cast -
<br />in -place structure to a three-story curtain wall. The main lobby's glass walls soar 19D feet to the top of the
<br />highest spire. The convention center's pre -function areas now total 200,000 sf, with exhibit space of over
<br />800,000 sf and meeting/ballroom space of over 130,000 sf including the largest ballroom in the country at
<br />38,000 sf.