Laserfiche WebLink
Jeff Schippers, CCM <br />Senior Construction Manager <br />22 <br />management, schedule, contract management, RFI's, submittals, bulletins, progress meetings and <br />change order negotiations. This project consisted of the addition of an impound room, locker rooms and <br />a storage room to the existing facility. New HVAC utilities were installed to extend air and heat services. <br />• Fire Department Headquarters and Jail Facility — Construction Manager for this 40,000 sf $5M <br />construction of new Fire Department. Responsible for design guidance/constructability review, cost <br />management, schedule, contract management, RFI's, submittals, bulletins, progress meetings and <br />change order negotiations. <br />• Community Center — Construction Manager for the $3M conversion of the existing 72,000 sf Fender <br />Music Museum to a new Community Center. Project included extensive structural modifications to build <br />a full-size indoor basketball court, addition of classroom, fitness and children's areas, new finishes <br />inside and out and an extensive integrated sound, paging and life safety systems. <br />Corona Animal Shelter, Phase 2, City of Corona, CA <br />Construction Manager for this $3M Animal Shelter Phase II Project. Responsible for design <br />guidance/constructability review, cost management, schedule, contract management, RFls, submittals, <br />bulletins, progress meetings, and change order negotiations. This project consisted of the addition of an <br />impound room, locker rooms and a storage room to the existing facility. New HVAC utilities were installed to <br />extend air and heat services. <br />Corona Animal Shelter, Phase I, City of Corona, CA <br />Construction Manager for the new $3M, 6,000 sf animal control facility with new office space, indoor and <br />outdoor kennel space, approximately two acres of site development with new utilities and parking areas, a <br />separate building for euthanasia and quarantine, and extensive drought tolerant landscaping and site lighting. <br />Corporate Yard Project, City of Corona, CA <br />Construction Manager for this $30M project which consisted of two tilt -up office buildings for a total of 80,000 <br />sq ft, both built to essential facility standards, including the Cities Emergency Operation Center and site <br />development. Generated daily, weekly, and year-end reports for individual projects, project estimations, and <br />overall team performance. Monitored and mentored the project staff and subcontractors to ensure safety, <br />quality and productivity. Reported directly to the City Manager. <br />LAX Midfield Satellite Concourse, Los Angeles, CA <br />Construction Manager responsible for onsite field operations for all mechanical, plumbing, electrical, fire <br />suppression and special systems. Responsible for trade coordination with all structural, civil and finish trades. <br />The LAX MSC project is a new ground up $1.33 project. The project consists of a new terminal building west of <br />the existing Tom Bradley terminal that includes 12 new international aircraft gates new taxi ways and a new <br />ramp control tower. The project also includes a new LADWP 34.5 KV substation to provide power to the new <br />MSC terminal and other LAX sites. <br />Long Beach Municipal Airport, Long Beach, CA <br />Construction Manager for this $70M Design/Build project which includes a new checked baggage inspection <br />building, a new airline ticketing building, new baggage claim area, new rental car offices in the existing historic <br />terminal building, new QTA and rental car space including fueling islands and wash stations. The project also <br />upgrades the airport access and public transit areas as well as a new concession area and a Meet and Greet <br />Plaza with wash rooms and back of house operational areas. <br />Anaheim Convention Center Expansion, City of Anaheim, CA <br />Construction Superintendent for the $118Mexpansion of the existing convention center to increase the size <br />40% to 1, r�N sf, restoring it to one of the ten largest convention centers in the country. The expansion was <br />more than an addition of space; it was a complete transformation of the convention center's single story, cast - <br />in -place structure to a three-story curtain wall. The main lobby's glass walls soar 19D feet to the top of the <br />highest spire. The convention center's pre -function areas now total 200,000 sf, with exhibit space of over <br />800,000 sf and meeting/ballroom space of over 130,000 sf including the largest ballroom in the country at <br />38,000 sf. <br />ZhIla....1. •claws City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 46 <br />