Laserfiche WebLink
Peter Ramey, PE <br />Senior Construction Manager <br />Mr. Ramey brings over 30 years of project and construction management, Experience <br />engineering and inspection experience on public agency and local 30 years <br />government projects. He has provided services on hundreds of projects for Education <br />the Los Angeles Department of Water and Power and for the cities of BS, Civil Engineering, CA State <br />Corona, Lake Elsinore and Moreno Valley. Assignments have ranged from Polytechnic University <br />street improvements and highway/bridge widenings to water/sewer pipeline Registrations <br />rehabilitation and new facility construction projects. His duties included Registered Civil Engineer, CA <br />construction administration, deputy inspection, contract schedules, #C42822 <br />supervision of contract forces for compliance with plans and specification, <br />prevailing wage compliance verification and certification, resident <br />engineering, engineers cost estimates, plan check street improvement plans, provide project specifications <br />(Notice Inviting Bids, Agreements, General Provisions, Technical Provision and Standard Plans). Peter brings <br />strong experience and working knowledge of Greenbook, Caltrans Local Procedures Manual, ARRA, CBDG. <br />FHWA and federal funding project requirements and administration. <br />Multiple Capital Improvement Projects, City of Corona, CA <br />Project/Construction Manager providing the City with construction management, project management and <br />inspection services on a variety of improvement projects. Main responsibilities center around the installation of <br />water/sewer pipelines and storm drains for both new construction and relocation projects. Inspected the <br />grading, excavation and installation of various project elements for adherence to plans and specifications. <br />Provides construction administration, cost estimates, and reviews documents for contract compliance. Projects <br />include: <br />• Grant Administration and Project Management for Various Projects — Project Manager overseeing the <br />design consultant, city staff, acquiring and administering the grant funding, bidding and awarding the <br />construction contract, and then managing the construction contract on multiple projects including the <br />$6.2M Green River Road project that included roadway widening and replacement, utility relocations, <br />storm drain and traffic signal work and the $1.7M Ontario Avenue Cold Pavement Rehabilitation project. <br />Specific work includes managing the design consultant, acquiring and administering the grant funding, <br />and ensuring the project plans were completed and ready for implementation. <br />• Ontario Avenue Pipeline — Replacement of several hundred feet of pipeline through a major street. <br />• Butterfield Recycled Waterline — Connect 5600' of 12" pipe to an existing pipeline to provide park with <br />reclaimed water. <br />• Annual Alley Rehabilitation — Resurfacing and associated work. <br />• Green River Road Widening — Construction Manager for this $8M roadway widening project. Project <br />features include demolition along traveled way and replacement of sidewalk, curb and gutters, new <br />water utilities in street, aggregate base, base paving and cap of this major arterial. Duties include <br />administering construction contract, oversight of City staff inspector, manage materials testing and <br />survey QA, prepare daily reports, process project documents, review and approve progress payments, <br />manage change order process, review and approve submittals, respond to RFI's, prepare project as- <br />builts and close out documentation. <br />• Foothill East Parkway Expansion — Construction of a two-mile roadway with curb, gutter, a raised <br />median, a multipurpose trail, sidewalks, landscaping, a bridge, street lights and three traffic signals. <br />Capital Improvement Projects, City of Lake Elsinore, CA <br />Project Manager overseeing several projects throughout the City. Oversaw construction activities, provided <br />construction inspection oversight, contract administration and engineering guidance. Projects include: <br />• Rosetta Canyon Fire Station and Park ($5.9M) — Construction of an 8,000 sf fire station and a park. <br />• Hwy-74 Widening at Interstate 215 ($5.21M) — Expansion and improvements of local highway. <br />• City Hall and Cultural Center ($1 M) — Seismic retrofit of a historic building. <br />• Boat Launch Project ($7.3M) — 400' long, six -lane launch and site improvements to the City owned <br />lake. <br />Capital Improvement Projects, City of Moreno Valley, CA <br />Project Manager for the City for 16 years overseeing several dozen projects. Provided design and engineering <br />oversight, contract compliance and management, and oversightlinspection of construction activities. Used <br />Claiiac.e.ps•ciatef City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 51 <br />