Laserfiche WebLink
Peter Ramey, PE <br />Senior Construction Manager <br />diverse experience and capabilities to manage sewer/water improvements, street improvement and widening <br />projects, and construction of fire and police facilities. Select projects include: <br />• Perris Blvd. Street Rehabilitation and Storm Drain Improvements ($1.24 — Street, curb, gutter and <br />storm drain improvements to improve accessibility and drainage. <br />• Public Safety Facility (Police Station) ($7.9M) — Construction of a new police station. <br />• Roadway Widening Storm Drain Line P-3 ($243K) — Street, curb, gutter and storm drain improvements. <br />• Street Widening and Storm Drain Line H-3 ($1.1 M — Street, curb, gutter and storm drain improvements. <br />• College Park Fire Station ($2.5M) — New fire station construction that included site improvements. <br />• Towngate Fire Station ($1.1 M — Construction of a new fire station. <br />Crown Valley Community Park - Tier 2, City of Laguna Niguel, CA <br />Project Engineer for a $5M park improvement. Provided submittal and RFI reviews. The project included 250' <br />double arch multi plate bridge and intersection improvements, spread footing with stone micro -piles, decorative <br />railing and lighting, pre-fab detention basins, new parking lots, bio filters, stream bed improvements, path and <br />trails, landscape and irrigation, recycled waterline and pump station, utility relocations. <br />Annual Paving Program, City of Indian Wells (FAMD #7), CA <br />Project Design and Construction Manager for a slurry and paving program valued at $750K. Project features <br />include slurry, cape seal and pavement reconstruction for 20 miles of roadway within the Indian Wells Country <br />Club. Duties included preparation of plans specifications and estimates, bidding and awarding the construction <br />contract, managing the field work and performing all contract administration for this five-year program. <br />City of Los Angeles Department of Water and Power, Los Angeles, CA <br />Project Engineer providing design, engineering and field construction oversight of Water and Power projects <br />throughout the City. Worked on distribution centers that included 2MG water tanks and fire suppression <br />systems, converter stations, maintenance facilities and parking structures. Select projects include: <br />• Distribution Station 96, Sylmar CA <br />• 2M Gallon Water Tanks/Fire Suppression System, Boulder, Nevada <br />• Sylmar Converter Station, Sylmar CA <br />• Palms Distribution Station, Los Angeles, CA <br />• Main Street Maintenance Facility, Los Angeles, CA — Five story parking facility <br />• Ely Microwave/Maintenance Headquarters Building, Ely, Nevada <br />C7a11acedAssoclases City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 52 <br />