Laserfiche WebLink
Gary McCredie, CMIT, C-Lic <br />Deputy Construction Manager <br />Santa Fe Springs Reservoir Transformation, City of Santa Fe Springs, CA <br />Served as Project Manager on this project which converted a 1.2 MG reclaimed water reservoir to a potable <br />water system. This conversion included disconnecting the existing reclaimed water line and disinfecting the <br />reservoir and associated piping. Project also involved rebuilding of appurtenant pipe materials including valves <br />and connecting the reservoir to an existing potable water system. <br />Santa Clara Ave. Sewer Main Replacement, City of Dana Point, CA <br />Project Manager on this project involving the replacement of 3,000' of 12" SDR-35 pipe. Project included the <br />installation of numerous sewer manholes ranging in depth from 12' to 17' deep. Project utilized open -cut <br />excavation and hydraulic shoring methods. <br />Western Avenue Pipe Burst, Golden State Water Company, Gardena, CA <br />Project Manager on this water main replacement involving the installation of 2,000' of HDPE pipe ranging in <br />size from 1" to 8", including water main, gate valves, fire hydrants and multiple water services. Water line was <br />installed using pipe bursting methods through and existing cast iron water main. Special conditions included <br />the installation of a bypass system to keep existing fire hydrants and domestic water services functional during <br />the water main installation. Project involved extensive traffic control on major city streets. <br />Madison Avenue Main Replacement, Golden State Water Company, Placentia, CA <br />Project Supervisor/Field contact with customer and agencies. This project involved over 1,500' of ductile iron <br />pipe, gate valves, fire hydrants and water services. <br />As -Needed Land Development/CIP Inspection, City of Rialto, CA <br />Construction Inspector for citywide projects involving on -site, off -site, grading, precise grading, and capital <br />improvement projects for the City. Projects features include water and sewer connection and <br />transmission/collection, grading, storm drain, street work, intersection and traffic signals, BMP's, landscaping, <br />irrigation, traffic control, parks and facilities. Duties include preparing daily reports, jobsite photos, <br />correspondence, coordination with City departments and third -party materials testing companies. <br />Arcade Creek Stabilization, Kinder Morgan, City of Carmichael, CA <br />Project Manager on this Geogrid-reinforced cellular confinement retaining wall consisted of rebuilding the creek <br />bank 17' in height and 115' in length. <br />Metrolink Bore, City of Burbank, CA <br />Project Manager on this project involving a 120' bore 15' deep. Bore was performed in order to install a 12" <br />HDPE waterline under the Metrolink tracks. Project also included digging a 25'x10'x17' launching pit and a <br />15'x10'x17' receiving pit and utilized trench shields as their shoring method. Project included pressure testing <br />and chlorination of new pipe and connecting to existing water mains. <br />Camp Luis Roth Waterline, Los Angeles Sheriff's Department, Tujunga Canyon, CA <br />Project Manager on this project to replace an existing waterline feeding the Camp Roth Jail. This project <br />involved the installation of 8,400' of 4" HDPE water pipe. Project utilized open -cut excavation in a high traffic <br />area and required extensive traffic control and permitting with the City of Los Angeles. <br />C7alla...... octates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 56 <br />