Gary McCredie, CMIT, C-Lic
<br />Deputy Construction Manager
<br />Santa Fe Springs Reservoir Transformation, City of Santa Fe Springs, CA
<br />Served as Project Manager on this project which converted a 1.2 MG reclaimed water reservoir to a potable
<br />water system. This conversion included disconnecting the existing reclaimed water line and disinfecting the
<br />reservoir and associated piping. Project also involved rebuilding of appurtenant pipe materials including valves
<br />and connecting the reservoir to an existing potable water system.
<br />Santa Clara Ave. Sewer Main Replacement, City of Dana Point, CA
<br />Project Manager on this project involving the replacement of 3,000' of 12" SDR-35 pipe. Project included the
<br />installation of numerous sewer manholes ranging in depth from 12' to 17' deep. Project utilized open -cut
<br />excavation and hydraulic shoring methods.
<br />Western Avenue Pipe Burst, Golden State Water Company, Gardena, CA
<br />Project Manager on this water main replacement involving the installation of 2,000' of HDPE pipe ranging in
<br />size from 1" to 8", including water main, gate valves, fire hydrants and multiple water services. Water line was
<br />installed using pipe bursting methods through and existing cast iron water main. Special conditions included
<br />the installation of a bypass system to keep existing fire hydrants and domestic water services functional during
<br />the water main installation. Project involved extensive traffic control on major city streets.
<br />Madison Avenue Main Replacement, Golden State Water Company, Placentia, CA
<br />Project Supervisor/Field contact with customer and agencies. This project involved over 1,500' of ductile iron
<br />pipe, gate valves, fire hydrants and water services.
<br />As -Needed Land Development/CIP Inspection, City of Rialto, CA
<br />Construction Inspector for citywide projects involving on -site, off -site, grading, precise grading, and capital
<br />improvement projects for the City. Projects features include water and sewer connection and
<br />transmission/collection, grading, storm drain, street work, intersection and traffic signals, BMP's, landscaping,
<br />irrigation, traffic control, parks and facilities. Duties include preparing daily reports, jobsite photos,
<br />correspondence, coordination with City departments and third -party materials testing companies.
<br />Arcade Creek Stabilization, Kinder Morgan, City of Carmichael, CA
<br />Project Manager on this Geogrid-reinforced cellular confinement retaining wall consisted of rebuilding the creek
<br />bank 17' in height and 115' in length.
<br />Metrolink Bore, City of Burbank, CA
<br />Project Manager on this project involving a 120' bore 15' deep. Bore was performed in order to install a 12"
<br />HDPE waterline under the Metrolink tracks. Project also included digging a 25'x10'x17' launching pit and a
<br />15'x10'x17' receiving pit and utilized trench shields as their shoring method. Project included pressure testing
<br />and chlorination of new pipe and connecting to existing water mains.
<br />Camp Luis Roth Waterline, Los Angeles Sheriff's Department, Tujunga Canyon, CA
<br />Project Manager on this project to replace an existing waterline feeding the Camp Roth Jail. This project
<br />involved the installation of 8,400' of 4" HDPE water pipe. Project utilized open -cut excavation in a high traffic
<br />area and required extensive traffic control and permitting with the City of Los Angeles.
<br />C7alla...... octates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 56