Laserfiche WebLink
Pat Shen, QSP <br />Senior Construction Inspector <br />Mr. Shen has over 22 years of construction management, construction <br />inspection and architectural experience on a vast array of city CIP <br />construction projects. Recently his project experience has focused on city <br />related CIP and public works projects that include pipeline installation, <br />traffic signal installation, interconnects, parks and related projects. Pat also <br />brings development experience having served as a Field Inspector and <br />Construction Manager for a contractor on numerous commercial and <br />medium -density housing projects. His duties encompassed field surveys, <br />bid analysis, code research, specifications, cost estimates, contracts, site <br />safety, weekly and technical reports, progress payments, change orders, <br />punch lists, and mediation and arbitration hearings. In addition to his <br />extensive construction inspection experience, Pat brings drafting and <br />design development experience in architectural and structural engineering. <br />Experience <br />22 years <br />Education <br />BA, Architecture, University of <br />Arizona <br />Certifications <br />Water Distribution D-5, DHS #8071 <br />ACI Concrete Technician, Grade 1 <br />OSHA 40-Hour HAZWOPER <br />Certified Public Infrastructure <br />Annual Sewer Rehabilitation Project, City of West Hollywood, CA <br />Provided resident inspection annual sewer rehabilitation of older sewer lines within a section of West <br />Hollywood as part of its annual rehabilitation program. The work consisted of Cured in Place Pipe CIPP (Slip <br />Lining) of older VCP sewer lines up to 6" diameter. Quantity of pipe rehabilitated totaled less than 1,000'. <br />Project included night work, review of video, tracking quantities and noting any anomalies in the video that <br />would be brought to the attention of the City Project Manager for review and acceptance. <br />Sewer Replacement Project, City of Seal Beach, CA <br />Construction Inspector for $1.2M project for replacement of approximately 150' of 36" sewer pipe and clean-up <br />of existing contaminated soil. Work included jacking pit, 20' depth, boring under roadway section of Lampson <br />and Seal Beach Boulevard. Work also included removal of contaminated soil from nearby fueling station, <br />backfill with suitable fill to bring back up to grade. <br />Moody Street Sewer Relocation Project, City of Cypress, CA: Construction Inspector for a sewer relocation <br />project for the City of Cypress. The work involved relocating two sewers on Moody Street and included traffic <br />control, excavating, trenching, saw cutting, bypass construction, pump setup, coring, shield and shoring setup, <br />concrete removal, manhole connections, removing VCP and old sewer main, installation of new VCP, pipe <br />deflection, ductile iron pipe at the crossing, slurry backfill, bypass removal and paving. <br />Chapman Avenue Pavement Reconstruction, City of Garden Grove, CA <br />Senior Construction Inspector during a $2.4M pavement reconstruction project through a major arterial and <br />several cross streets in the City. Duties include pre -construction activities, permits, administering the contract, <br />inspecting the work of various contractors, documenting the work via daily reports and digital photography, <br />ensuring quality control, verifying quantities, participating in weekly progress meetings, processing control <br />documents such as RFI's, submittals, progress payments, negotiating and managing change orders, and <br />monitoring schedules. <br />Magnolia Street Rehabilitation, City of Garden Grove, CA <br />Senior Construction Inspector for a $3.1 M one -mile roadway rehabilitation project with local funding on <br />Magnolia Street from Garden Grove Boulevard, crossing under the SR-22 Freeway to the end of the off ramps. <br />Project features included traffic signals and ADA ramps at Magnolia and Trask intersection, coordination with <br />Caltrans for work under SR-22 freeway, installation of 2" - 96" diameter stainless steel pipes of about 150' for <br />storm water retention which were connected to sump pumps near the low point at the freeway, dig outs for full <br />section rehabilitation, used 5% cement treated base which included grinding and mixing of the old roadway <br />asphalt, concrete medians, driveways, sidewalks and ADA ramps. Duties included pre -construction photos, <br />daily inspection reports, weekly statement of working days, quantity calculations, RFI's, coordination with <br />materials testing firm, job site photos, as-builts, final walk through and close out. <br />Sidewalk Repair for Handicap Access 1-136, City of Torrance, CA <br />Senior Construction Inspector on this $1.5M project that repaired damaged sidewalks, curb and gutter, <br />driveway approaches and handicap curb ramps. Additional inspection work included tree root pruning and tree <br />removal and replacements. Project funding included CDBG funds. Duties included inspecting the contractor's <br />work, documenting the work via daily reports and digital photography and ensuring quality control. <br />C7ailac I. ASsoclues City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 62 <br />