Laserfiche WebLink
Pat Shen, QSP <br />Senior Construction Inspector <br />Various Residential Street Pavement Rehabilitation, Garden Grove, CA <br />Resident Inspector for this $2M street rehabilitation Project, Full section removal, concrete work replacement, <br />Section was 5" Cement Treated Base, 2.5" base course and 1.5" ARHM. Duties included pre -construction <br />photos, daily inspection reports, weekly statement of working days, quantity calculations, RFI's, coordination <br />with materials testing firm, job site photos, as-builts, final walk through and close out. <br />Inspection of Various Federal and State Funded Projects, City of West Hollywood, CA <br />Construction Inspector for assignments which encompassed street rehabilitation, street improvements, <br />aesthetic improvements, safety improvements, traffic improvements, ARHM asphalt paving, lime treatment, <br />grinding, traffic signals, interconnects, curb and gutter, sidewalks, decorative paving, bus pads, bus stop <br />improvements, street lighting, ADA ramps, SWPPP, BMPs, NPDES, sewer repair and rehabilitation, <br />landscaping and irrigation. Duties included pre -construction activities, permits, administering the contract, <br />inspecting the work of various contractors, documenting the work via daily reports and digital photography, <br />ensuring quality control, verifying quantities, conducting weekly progress meetings, processing control <br />documents such as RFI's, submittals, progress payments, certified payrolls, negotiating and managing change <br />orders, providing field fixes to design issues and monitoring schedules. Projects included: <br />• Santa Monica Boulevard from Doheny to San Vicente one side grind and overlay % mile <br />• Fairfax from Santa Monica Blvd to Fountain full grind and overlay 1600' <br />• San Vicente from Melrose to Santa Monica Blvd full grind and overlay 1500' <br />• Local Residential Street grind and overlay approximately two miles <br />• Local Roadway replacement with ARHM, lime treatment, grinding and overlay 800' <br />Knott Street Improvements, City of Garden Grove, CA <br />Senior Construction Inspector for this $2.2M roadway rehabilitation project. Project included FHWA federal <br />funding requirements with Caltrans local oversight. Duties included pre -construction activities, permits, <br />administering the contract, inspecting the work of various contractors, documenting the work via daily reports <br />and digital photography, ensuring quality control, verifying quantities, conducting weekly progress meetings, <br />processing control documents such as RFI's, submittals, progress payments, certified payrolls, negotiating and <br />managing change orders, providing field fixes to design issues and monitoring schedules. <br />La Brea Avenue Streetscape Improvement, City of West Hollywood, CA <br />Construction Inspector for streetscape project that involved 5,729 sf of new green space using drought tolerant <br />plantings, 40 new street trees, medians, planted tree well, parkways designed as infiltration planters and 21 <br />new blue pedestrian level street lights along La Brea Avenue on the three -block segment from Fountain <br />Avenue to Romaine Street. The work consisted of pavement preparation, street resurfacing, cold milling, <br />pavement striping and markings, bus pad installation, loop replacement, adjustment of manhole frame and <br />utility cover to grade, and installation of a pedestrian signal. <br />On -Call Public Works Inspection Services, City of San Juan Capistrano, CA <br />Construction Inspector for this on -call project that included asphalt paving, storm drains, concrete sidewalks, <br />curb and gutter, street lighting, traffic signals, water lines and sanitary sewers. Inspected the work of the <br />various contractors, documented work via daily reports and job photos, ensured quality control, verified <br />quantities, and coordinated with employees of the City of San Juan Capistrano engineering and maintenance <br />departments to ensure successful projects. <br />CIP and Land Development Projects, City of Irvine, CA <br />Senior Construction Inspector that provided daily inspections in support of the City of Irvine CIP and Land <br />Development programs. Projects included grading, street paving, slurry, flatwork, landscaping, irrigation, street <br />lights, traffic signals, storm drainage pipe and structures. Prepared daily reports for all projects including <br />manpower, quantities, equipment, activities, items of work and subcontractors on site. Also managed CCO's, <br />quantity calculations and construction issues. <br />Joint Transmission Main Reach 7 Permanent Repair, Cities of Dana Point / Laguna Niguel, CA <br />Construction Inspector to the South Coast Water District for this $3.2M pipeline project. The work included <br />grading, excavating, dewatering, installing 5,400' of 36" CML&C, cast -in -place concrete vault, valves, fittings, <br />blow -off assemblies, hatches, sump pump, instrumentation, telemetry, RTU, cathodic protection, anode well, <br />electrical work, pressure testing and disinfection. <br />C7aIlacePnssoclues City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 63 <br />