Pat Shen, QSP
<br />Senior Construction Inspector
<br />Various Residential Street Pavement Rehabilitation, Garden Grove, CA
<br />Resident Inspector for this $2M street rehabilitation Project, Full section removal, concrete work replacement,
<br />Section was 5" Cement Treated Base, 2.5" base course and 1.5" ARHM. Duties included pre -construction
<br />photos, daily inspection reports, weekly statement of working days, quantity calculations, RFI's, coordination
<br />with materials testing firm, job site photos, as-builts, final walk through and close out.
<br />Inspection of Various Federal and State Funded Projects, City of West Hollywood, CA
<br />Construction Inspector for assignments which encompassed street rehabilitation, street improvements,
<br />aesthetic improvements, safety improvements, traffic improvements, ARHM asphalt paving, lime treatment,
<br />grinding, traffic signals, interconnects, curb and gutter, sidewalks, decorative paving, bus pads, bus stop
<br />improvements, street lighting, ADA ramps, SWPPP, BMPs, NPDES, sewer repair and rehabilitation,
<br />landscaping and irrigation. Duties included pre -construction activities, permits, administering the contract,
<br />inspecting the work of various contractors, documenting the work via daily reports and digital photography,
<br />ensuring quality control, verifying quantities, conducting weekly progress meetings, processing control
<br />documents such as RFI's, submittals, progress payments, certified payrolls, negotiating and managing change
<br />orders, providing field fixes to design issues and monitoring schedules. Projects included:
<br />• Santa Monica Boulevard from Doheny to San Vicente one side grind and overlay % mile
<br />• Fairfax from Santa Monica Blvd to Fountain full grind and overlay 1600'
<br />• San Vicente from Melrose to Santa Monica Blvd full grind and overlay 1500'
<br />• Local Residential Street grind and overlay approximately two miles
<br />• Local Roadway replacement with ARHM, lime treatment, grinding and overlay 800'
<br />Knott Street Improvements, City of Garden Grove, CA
<br />Senior Construction Inspector for this $2.2M roadway rehabilitation project. Project included FHWA federal
<br />funding requirements with Caltrans local oversight. Duties included pre -construction activities, permits,
<br />administering the contract, inspecting the work of various contractors, documenting the work via daily reports
<br />and digital photography, ensuring quality control, verifying quantities, conducting weekly progress meetings,
<br />processing control documents such as RFI's, submittals, progress payments, certified payrolls, negotiating and
<br />managing change orders, providing field fixes to design issues and monitoring schedules.
<br />La Brea Avenue Streetscape Improvement, City of West Hollywood, CA
<br />Construction Inspector for streetscape project that involved 5,729 sf of new green space using drought tolerant
<br />plantings, 40 new street trees, medians, planted tree well, parkways designed as infiltration planters and 21
<br />new blue pedestrian level street lights along La Brea Avenue on the three -block segment from Fountain
<br />Avenue to Romaine Street. The work consisted of pavement preparation, street resurfacing, cold milling,
<br />pavement striping and markings, bus pad installation, loop replacement, adjustment of manhole frame and
<br />utility cover to grade, and installation of a pedestrian signal.
<br />On -Call Public Works Inspection Services, City of San Juan Capistrano, CA
<br />Construction Inspector for this on -call project that included asphalt paving, storm drains, concrete sidewalks,
<br />curb and gutter, street lighting, traffic signals, water lines and sanitary sewers. Inspected the work of the
<br />various contractors, documented work via daily reports and job photos, ensured quality control, verified
<br />quantities, and coordinated with employees of the City of San Juan Capistrano engineering and maintenance
<br />departments to ensure successful projects.
<br />CIP and Land Development Projects, City of Irvine, CA
<br />Senior Construction Inspector that provided daily inspections in support of the City of Irvine CIP and Land
<br />Development programs. Projects included grading, street paving, slurry, flatwork, landscaping, irrigation, street
<br />lights, traffic signals, storm drainage pipe and structures. Prepared daily reports for all projects including
<br />manpower, quantities, equipment, activities, items of work and subcontractors on site. Also managed CCO's,
<br />quantity calculations and construction issues.
<br />Joint Transmission Main Reach 7 Permanent Repair, Cities of Dana Point / Laguna Niguel, CA
<br />Construction Inspector to the South Coast Water District for this $3.2M pipeline project. The work included
<br />grading, excavating, dewatering, installing 5,400' of 36" CML&C, cast -in -place concrete vault, valves, fittings,
<br />blow -off assemblies, hatches, sump pump, instrumentation, telemetry, RTU, cathodic protection, anode well,
<br />electrical work, pressure testing and disinfection.
<br />C7aIlacePnssoclues City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 63
<br />
|