Cesar Ramirez, EE
<br />Senior Construction Inspector
<br />,tv
<br />Lakewood Boulevard Street Improvements, City of Downey, CA
<br />Senior Construction Inspector for the construction of right turns, traffic signals, relocation of So Cal Edison
<br />poles, relocation of water lines, new street light poles, curb and gutter, cold -milling and overlay of existing
<br />lanes, and striping. Responsibilities included performing daily inspections, administering contract documents,
<br />conducting weekly progress meetings, processing submittals, request for information and clarification, change
<br />orders and progress payments, generating final punch lists and monitoring the contractor's schedule. Other
<br />duties involved documenting the work via daily reports including City's excel forms and digital photography,
<br />and coordinating with various agencies, utilities and residents.
<br />Doran Street Rehabilitation, City of Glendale, CA
<br />Senior Construction Inspector for $2.51M roadway rehabilitation project for about one mile on Doran Street (two
<br />lanes) from Brand Avenue to Adams Street. Project features include four intersections with new traffic signals,
<br />ARHM paving, type 2 slurry seal on side streets and adjustment to existing manholes and water meters to
<br />finish grade. Project also included improvements on Jackson Street from Doran to Monterey and 300' ADA
<br />ramps at the intersections of Jackson Street and Kenwood Place. Part of the project included FHWA funding
<br />and record keeping requirements for daily inspection reports, progress payment quantities and employee
<br />interviews. Duties included pre -construction photos, daily inspection reports, weekly statement of working
<br />days, quantity calculations, RFI's, coordination with materials testing firm, job site photos, as-builts, final walk
<br />through and close out.
<br />2017 Street Pavement Maintenance and Rehabilitation, City of Corona, CA
<br />Provided construction inspection during the $2.9M street improvements with grind and overlay on four major
<br />arterials including Lincoln Avenue, Main Street, Hamner Avenue and River Road.
<br />Multiple City Projects, Southern CA
<br />Construction Inspector with duties that included daily inspections, administering contract documents, upholding
<br />code requirements, conducting weekly progress meetings, processing submittals, request for information and
<br />clarification, change orders and progress payments, coordinating with various agencies, utilities and residents,
<br />generating final punch list, ensuring traffic control, monitoring the contractor's schedule, maintaining public
<br />relations, documenting the work via daily reports including ARRA and Transportation Manual excel forms and
<br />digital photography. Projects included:
<br />• City of Compton, ARRA Rehabilitation Project for Greenleaf Boulevard and Santa Fe Avenue —
<br />Included 1,45,200 sf existing asphalt ground, 2,944 tons of leveling course, 9,202 tons of ARHM, R/R
<br />of wheel chair ramps, C/G, sidewalks and deco -crosswalks
<br />• City of Compton — ARRA project for the traffic light signals upgrading on 80 intersections in the City
<br />• City of Norwalk, Norwalk Park Well — Construction of wellhead facilities and 2,500' of 12"DIP
<br />City Street Light Upgrade, City of Corona, CA
<br />Provided construction inspection during the $31M replacement of inefficient, high pressure sodium street lights
<br />with new LED street lights, as well as installing a lighting control system that will be used for proactively
<br />maintaining street lights. Approximately 8,000 streetlights throughout the City were replaced in four phases
<br />over a six-month period. Inspection occurred at several sites in one shift with up to six contractor crews
<br />working throughout the City. The project was funded by special district property taxes that can only be used for
<br />street light operation and maintenance, as well as Gas Tax revenues.
<br />Construction Inspector, Various Locations, CA
<br />As Construction Inspector responsibilities included daily inspections, administering contract documents,
<br />upholding code requirements, conducting weekly progress meetings, processing submittals, request for
<br />information and clarification, change orders and progress payments, coordinating with various agencies,
<br />utilities and residents, earthwork calculations, generating the final punch list and monitoring the contractor's
<br />schedule. Maintained documentation of the work via daily reports, construction forms and digital photography.
<br />Projects included:
<br />• City of San Juan Capistrano — Directional drilling construction of a 14" HDPE pipe under the San Juan
<br />Capistrano River
<br />• City of San Juan Capistrano — On -call inspection for several CIP projects
<br />• City of West Hollywood — La Cienega Boulevard and Melrose Avenue street paving
<br />C7allacesnssoclases City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 66