Laserfiche WebLink
Cesar Ramirez, EE <br />Senior Construction Inspector <br />,tv <br />Lakewood Boulevard Street Improvements, City of Downey, CA <br />Senior Construction Inspector for the construction of right turns, traffic signals, relocation of So Cal Edison <br />poles, relocation of water lines, new street light poles, curb and gutter, cold -milling and overlay of existing <br />lanes, and striping. Responsibilities included performing daily inspections, administering contract documents, <br />conducting weekly progress meetings, processing submittals, request for information and clarification, change <br />orders and progress payments, generating final punch lists and monitoring the contractor's schedule. Other <br />duties involved documenting the work via daily reports including City's excel forms and digital photography, <br />and coordinating with various agencies, utilities and residents. <br />Doran Street Rehabilitation, City of Glendale, CA <br />Senior Construction Inspector for $2.51M roadway rehabilitation project for about one mile on Doran Street (two <br />lanes) from Brand Avenue to Adams Street. Project features include four intersections with new traffic signals, <br />ARHM paving, type 2 slurry seal on side streets and adjustment to existing manholes and water meters to <br />finish grade. Project also included improvements on Jackson Street from Doran to Monterey and 300' ADA <br />ramps at the intersections of Jackson Street and Kenwood Place. Part of the project included FHWA funding <br />and record keeping requirements for daily inspection reports, progress payment quantities and employee <br />interviews. Duties included pre -construction photos, daily inspection reports, weekly statement of working <br />days, quantity calculations, RFI's, coordination with materials testing firm, job site photos, as-builts, final walk <br />through and close out. <br />2017 Street Pavement Maintenance and Rehabilitation, City of Corona, CA <br />Provided construction inspection during the $2.9M street improvements with grind and overlay on four major <br />arterials including Lincoln Avenue, Main Street, Hamner Avenue and River Road. <br />Multiple City Projects, Southern CA <br />Construction Inspector with duties that included daily inspections, administering contract documents, upholding <br />code requirements, conducting weekly progress meetings, processing submittals, request for information and <br />clarification, change orders and progress payments, coordinating with various agencies, utilities and residents, <br />generating final punch list, ensuring traffic control, monitoring the contractor's schedule, maintaining public <br />relations, documenting the work via daily reports including ARRA and Transportation Manual excel forms and <br />digital photography. Projects included: <br />• City of Compton, ARRA Rehabilitation Project for Greenleaf Boulevard and Santa Fe Avenue — <br />Included 1,45,200 sf existing asphalt ground, 2,944 tons of leveling course, 9,202 tons of ARHM, R/R <br />of wheel chair ramps, C/G, sidewalks and deco -crosswalks <br />• City of Compton — ARRA project for the traffic light signals upgrading on 80 intersections in the City <br />• City of Norwalk, Norwalk Park Well — Construction of wellhead facilities and 2,500' of 12"DIP <br />City Street Light Upgrade, City of Corona, CA <br />Provided construction inspection during the $31M replacement of inefficient, high pressure sodium street lights <br />with new LED street lights, as well as installing a lighting control system that will be used for proactively <br />maintaining street lights. Approximately 8,000 streetlights throughout the City were replaced in four phases <br />over a six-month period. Inspection occurred at several sites in one shift with up to six contractor crews <br />working throughout the City. The project was funded by special district property taxes that can only be used for <br />street light operation and maintenance, as well as Gas Tax revenues. <br />Construction Inspector, Various Locations, CA <br />As Construction Inspector responsibilities included daily inspections, administering contract documents, <br />upholding code requirements, conducting weekly progress meetings, processing submittals, request for <br />information and clarification, change orders and progress payments, coordinating with various agencies, <br />utilities and residents, earthwork calculations, generating the final punch list and monitoring the contractor's <br />schedule. Maintained documentation of the work via daily reports, construction forms and digital photography. <br />Projects included: <br />• City of San Juan Capistrano — Directional drilling construction of a 14" HDPE pipe under the San Juan <br />Capistrano River <br />• City of San Juan Capistrano — On -call inspection for several CIP projects <br />• City of West Hollywood — La Cienega Boulevard and Melrose Avenue street paving <br />C7allacesnssoclases City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 66 <br />