Jeremy Vander Veen
<br />Senior Construction Inspector —_
<br />Mr. Vander Veen is a skilled Construction Inspector with over ten years of
<br />Experience
<br />professional quality assurance experience and expertise. His background
<br />10 years
<br />includes all aspects of public works including wet and dry utility
<br />Education
<br />infrastructure projects. Jeremy takes measures to ensure that his projects
<br />California Baptist University,
<br />are constructed in conformance with the project plans and specifications
<br />Riverside, CA
<br />as well as regional standards (Greenbook, AWA, etc.) He has both
<br />Riverside Community College,
<br />extensive roadway and water/sewer pipe installation experience. Jeremy
<br />Riverside, CA
<br />has excellent verbal and written communication skills, pays attention to
<br />Certifications
<br />detail and can read and interpret plans. Clients appreciate that he is a
<br />OSHA 30-hour
<br />consummate team player.
<br />City -Wide CIPP Sewer Rehabilitation Project, City of Long Beach, CA Hazwoper40-hour
<br />Construction inspector for the $4M Cured -in -Place -Pipe rehabilitation for a
<br />variety of sewer collection lines in the City of Long Beach. Provided construction inspection services for the
<br />spot repairs, small replacements and then 7,000' in slip lining of mains and laterals up to 16' diameter for this
<br />10-month project. The project included cleaning, cured -in -place pipe installation and CCTV of local small
<br />diameter sewers. Duties included inspection of water, sewer and storm drain installation. Prepared daily
<br />inspection reports documenting work including, description, locations, stations, workforce, materials and
<br />quantities of bid items. Passed out shut down notifications and responded to citizen comments/complaints.
<br />Verified that work was in conformance with the plans and specifications.
<br />Diemer Pipeline Inspection, Laguna Niguel, Moulton Niguel Water District, CA
<br />Construction inspector for the Diemer Pipeline Inspection. The Diemer Pipeline is a 36" diameter CML&C steel
<br />pipe which was exposed above ground and located within railroad right-of-way. The exposed pipeline was
<br />relocated above ground and spans the existing drainage channel with 6' to 7' of clearance (from the bottom of
<br />the channel). Provided construction observation/inspection services for the work the contractor performed
<br />during the construction activities.
<br />Elmrock and Cobblestone Pipeline Replacement, Suburban Water Systems, City of La Mirada, CA
<br />The work included paving 1,600' of four -lane wide full rebuild with aggregate base section and 1'/" over 5"
<br />asphalt concrete at the Santa Gertudus Arterial intersection. Project also included installation of new 3,250' of
<br />8" PVC, 680' of 6" PVC and 150' of 4" PVC water main including 70 services and six 6" fire hydrant assemblies
<br />in various residential streets. Project included slurry seal of all residential streets.
<br />Plant 161 Pipeline Project, Suburban Water Systems, City of Hacienda Heights, CA
<br />Construction inspector for approximately 800' of 8" DR-14 PVC water main including 15' of 6" steel pipe,
<br />pressure control valves and 5'x6'x6' precast concrete vault. Work done in various residential streets.
<br />Grayling and Maybrook Water Pipeline Replacement, Suburban Water Systems, City of La Mirada, CA
<br />Construction inspector for approximately 2,700'of 8" and 50' of 6" DR-14 PVC water main including 65 services
<br />and six 6" fire hydrant assemblies in various residential streets.
<br />Brasada Residential Project — Water System Installation New Water Main, Golden State Water
<br />Company, San Dimas, CA
<br />Construction inspector for approximately 7,820' of 12"PVC, 2,480' of 12"DI pipe including booster pump,
<br />residential services and fire hydrant assemblies through new residential development.
<br />Royal Avenue Pipeline Bridge Crossing, Golden State Water Company, Simi Valley, CA
<br />Construction inspector for installation of 130' of 8" welded steel to the underside of Royal Ave bridge with
<br />hangers. Project included two tie ins, valves, flex joints and air vac.
<br />Youngwood Pipeline Project, Suburban Water Systems, City of Whittier, CA
<br />Construction inspector for approximately 3,675' of 8" DR-14 PdC water main including five tie ins, (1) 8" fire
<br />service and one 4" domestic service with 4' x 6' x 4' Armorcast vault assembly in various residential streets.
<br />Homeland Pipeline Replacement, Suburban Water Systems, City of Whittier, CA
<br />Construction inspector for approximately 2,650' of 8" DR-14 PVC water main including 45 services and four 6"
<br />Fire hydrant assemblies in various residential streets.
<br />©allacecassoclases City of Santa Ana i Water Resources Construction Management and Inspection Services No. 19-116 68
<br />
|