Laserfiche WebLink
Jeremy Vander Veen <br />Senior Construction Inspector <br />K <br />Stanton Avenue Pipeline, Suburban Water Systems, City of La Mirada, CA <br />Construction inspector for about 2,000' of 12" water main, 2,600' of 8" water main, and 600' of 4" and 6" water <br />main. Water mains were constructed in eight residential streets and included about 150 services. <br />Plant 408 Site Improvements, Suburban Water Systems, City of La Mirada, CA <br />Construction inspector for demolition of a 7 MG hopper bottom reservoir, 24" watermain with bore and jack <br />construction under a residential property, storm drains, 1,000' of 10' to 25' high cantilevered and tie -backed <br />retaining walls, 60,000 cy of earthwork removal and landscaping. In addition to verifying that construction was <br />performed in accordance with the contract documents, inspection services included performing public relations <br />with neighbors, coordinating testing (concrete, soil compaction, welding, water quality, etc.), coordination of <br />schedules, attending construction meetings and providing input, tracking extra work, coordinating 3rd party <br />construction work (offsite fabrication of pile beams and coating) and coordinating permit inspection (e.g. <br />County grading permit, archeological/cultural inspection, etc.). <br />Plant 13 Booster Station Rehabilitation and Well 22 Improvements, City of Lakewood, CA <br />Provided construction inspection for the replacement of a 4,800 gpm booster pump station and replacement of <br />a 1,200 gpm well pump. In addition to the booster pump station replacement, the construction was phased so <br />the booster station continued to stay operational during the construction phase. <br />Long Beach Alley Water Main Conversions, City of Long Beach, CA <br />Construction inspector for the Long Beach Alley Water Main Conversion Project which involved performing <br />service connections to homes and businesses. <br />Long Beach 8 Valve Improvement Project (EO-3241), Long Beach Water Department, Long Beach, CA <br />Long Beach 8 Valve Improvement Project included work on two separate sites being the Wardlow and Pacific <br />Intersection, and the LB-8 site. Provided construction inspection services for the work the contractor performed <br />including refurbish menUinstallation of a 12" control valve, installing two pressure reducing valves, two flow <br />control valves, furnishing and installing a new vault including grated cover, ladder, sump, new piping, <br />SCADA/electrical and instrumentation work, hot -tap and highline-stop connections, removal and disposal of <br />existing piping, pavement replacement, traffic control, shoring and backfilling. <br />Security Manhole Entrances for Port Utility Network Project, Port of Long Beach, Long Beach, CA <br />Construction inspector responsible for quantity verification, construction installation verification in accordance <br />with plans and specifications, and construction progress documentation which includes daily record of progress <br />and photographic documentation. The purpose of this project is to further increase the security of the Port by <br />limiting the access points within the Port by replacing existing manhole frames and covers with secure <br />manhole lids. This project will improve 450 manhole entrances by replacing current infrastructure with secure <br />locking manhole lids. <br />Portola Park Project, City of Lake Forest, CA <br />Construction inspector for the $5.1M Portola Park project that will construct a 6.3 acre park located near the <br />intersection of Saddleback Ranch Road and Glenn Ranch Road. The proposed new park will feature a tot lot, <br />open turf play area with a soccer field for children under 10 years old, pickleball courts, a sand volleyball court, <br />restrooms, picnic gazebos and associated hardscaping, landscaping and electrical improvements. In addition, <br />the proposed park will include a .9-acre dog park. Project includes 10.8 net acres of public and private parks, <br />recreational facilities, and public use trails equating to 8.55 acres of public park credit. Prepares daily <br />inspection reports documenting work including, description, locations, stations, workforce, materials and <br />quantities of bid items. <br />SSA Marine TWIC Fiber Optic Network "Beastnet", Port of Long Beach, Long Beach, CA <br />Fiber Optic Construction Superintendent for the design and installation of a Fiber Optic Network connecting <br />four terminals through the Port of Long Beach. This secure, private network was developed to support the <br />Federal TWIC program to increase security at each terminal by matching all entrants to a database of <br />registered participants. The network was designed to meet current needs but also provided the infrastructure to <br />accommodate future increases at minimal cost. This construction of the Fiber Optic Network included the <br />installation of manholes, handholes and 12-strand single mode fiber within the existing terminal facilities to <br />support the needs of SSA Marine and the Federal Transportation Worker Identification Card (TWIC) system. <br />C7su.... a s.cates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 69 <br />