Laserfiche WebLink
Rick Wiggins <br />Senior Construction Inspector <br />Mr. Wiggins has over 20 years of Construction Inspection experience on a <br />variety of construction projects in Southern California. He is experienced in <br />transportation projects, including the rehabilitation of streets and roadways <br />within Caltrans' ROW; construction of driveway, sidewalk, curb, and gutter <br />along major City arterial streets; construction of ADA compliant ramps; <br />installation of traffic signals, traffic loops, cameras, and bicycle loops; and <br />preservation of environment and landscape in ecologically sensitive areas. <br />Additionally, he is experienced in Public Works projects, including <br />wastewater treatment, wastewater collection system, wastewater <br />rehabilitation, water production and distribution, paving and drainage. His <br />projects have included the construction of water mains, sewer lines, storm <br />drains and box culverts. Rick excels at making sure that the contractor's <br />work is in compliance with approved contract documents. He is adept at <br />interpreting contract documents including specifications, correctly under <br />field conditions. Rick is also skilled at witnessing performance tests <br />conducted by contractors on infrastructure improvements. He is an expert <br />at preparing detailed field reports documenting observed conditions, <br />conducting "punch list" inspections of all improvements, and coordinating <br />all activities between the Client, engineers, and contractor. Furthermore, <br />he effectively communicates in an objective, non -confrontational manner. <br />Experience <br />20 years <br />Train ing/Certifications <br />ACI Concrete Field Testing <br />Technician — Grade I, American <br />Concrete Institute, CA <br />Registered Construction Inspector <br />through the ACIA <br />Certified Public Works Inspector <br />through the ACIA <br />OSHA 10-Hour & 30-Hour <br />Construction Safety <br />NPDES Regulations & Best <br />Management Practices <br />40-Hour HAZWOPER as per CFR <br />1910.120(e) <br />Confined Spaces Training <br />CVWD Dos Palmas, Coachella Valley Water District, Coachella Valley, CA <br />Project Inspector during the construction of 1,800' of recharge basin in the old unlined Coachella Canal. This <br />project also involved the construction of 740' of six' water supply pipeline; construction of 400' of two" PVC <br />pipeline within Dos Palmas ACEC; construction of one two" diameter monitoring well near the unlined canal <br />percolation basin; construction and development of one production well with discharge head within Aqua <br />Farms; destruction of two wells, the mechanical cleaning of two existing wells; and clearing of 600' of recharge <br />basin within Aqua Farms property. <br />Created Marsh for the Coachella Canal Lining Project, Coachella Valley Water District, Dos Palmas <br />Preserve, CA <br />Project Inspector for the installation of 12" epoxy coated and lined ductile iron pipes and all appurtenances; 12" <br />concrete pipe and all appurtenances; precast vaults, covers, and all appurtenances; 12" Waterman C10 flat <br />backed slide gates including all appurtenances; and 12" Waterman C20 flat backed slide gates including all <br />appurtenances. This project also involved dewatering; earthwork, grading, berms, and geotextile fabric; and <br />cast -in -place concrete pads and weirs. <br />On -Call Construction Observation Services, Coachella Valley Water District, Palm Desert, CA <br />Project Inspector providing on -call construction observation services for the CIP Contract that included the <br />installation of electrical, waterline, sewer lines, and sewer storm drains as well as chlorination testing. <br />University Park Project, Hover Development Company, Inc., Palm Desert, CA <br />Project Inspector during the construction of a 250-acres development site of a combination of residential and <br />commercial tracts. Project involved the mass grading of over 1.5 million cubic yards of dirt; the construction of <br />new roadways, sewer and domestic water services, and storm drain systems; and the installation of dry utility <br />conduits. This project also included the construction of retaining walls and all aspects of landscaping <br />construction, including two new parks. <br />Larimore Avenue Pipeline Replacement, Suburban Water Systems, City of La Puente, CA <br />Project Inspector for 1,300' of 8" PVC water main, 34 water services, two fire hydrants, and five tie-ins located <br />on a residential street. <br />Montbrook and Glenhope Pipeline Replacement, Suburban Water Systems, City of La Puente, CA <br />Project Inspector for 1,300' of 8" PVC water main and 900' of 6" and 4" PVC water main, 40 water services, <br />four fire hydrants, and seven tie-ins located in two residential streets. <br />Lawndale and Loukelton Pipeline Replacement, Suburban Water Sytems, City of La Puente, CA <br />Project Inspector for 100' long bore and jack of 24" casing, 2,100' of 12" PVC water main, 4,700' of 8" PVC <br />water main, 125 water services, 15 fire hydrants, and 20 tie-ins located in several residential streets. <br />C7..Ila....- adares City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 71 <br />