Rick Wiggins
<br />Senior Construction Inspector
<br />�0'
<br />Yale Avenue Water Main Replacement, Golden State Water Company, City of Claremont, CA
<br />Project Inspector for the Water Main Installation at Yale Avenue, from 1st Street to 7th Street & 2nd Street,
<br />from Indian Hill Boulevard to Harvard Avenue located in the City of Claremont in Los Angeles County. The
<br />project primarily consisted of the installation of approximately 3,600' of 8" ductile iron pipe, six fire hydrants, a
<br />water sampling station, and other miscellaneous pipeline appurtenances.
<br />Sewer Pipeline Replacement - Citywide (Phase IV) Construction Inspection, City of Pomona, CA
<br />Citywide (Phase IV), Project No. 586-86022. This project included the replacement of 16 sewer facilities
<br />(manhole- to manhole) at 4,213' and 155 sewer point replacements within 4,135' in the City of Pomona.
<br />Golden State Water Company (On -Call), Various Projects
<br />Various on -call water projects in the San Dimas, CA area.
<br />Mission Basin Desalting Facility New Operations Building Project, City of Oceanside, Oceanside, CA
<br />Project Inspector for this building project. Duties included: conducting the preconstruction conference, review
<br />of preconstruction submittals and coordination with outside agencies/stakeholders. Construction Phase
<br />Services included project document control, construction progress meetings, project coordination, shop
<br />drawing and submittal review, interpretation of plans and specifications (RFI processing), responding to
<br />change order requests and progress payment reviews. Also provided daily construction monitoring and photo
<br />documentation and upon completion project closeout items.
<br />Highway 76 East Segment Realignment, Rainbow Municipal Water District, Fallbrook, CA
<br />Provided Inspection services for the Caltrans State Highway 76 East Segment Realignment specific to the
<br />RMWD's sanitary sewer reconstruction, water utility relocation, and gabion embankment construction work
<br />within this project required to protect those utilities. This project is a result of Caltrans widening and
<br />realignment of Highway 76 east segment which contains RMWD's existing utilities which now must be re-
<br />located to accommodate the revisions to new Highway 76. This work is comprised of approximately 12,100'
<br />sanitary sewers and appurtenant manholes, the reconstruction of the gabion embankment protection across
<br />Live Oak Creek, and the reconstruction of the water main in Ramona Drive.
<br />St. Maio Lift Station Upgrades Project, City of Oceanside, CA
<br />Project Inspector to the City during this project. Provided full-time inspection and administration services
<br />through the project work that included connection to the newly constructed lift station valve vault including,
<br />pipe, excavation, shoring, dewatering, bypassing, bedding, backfill, resurfacing, hauling, off -site legal disposal,
<br />erosion control, manhole rehabilitation, and traffic control. Work also included a rehabilitation of the existing
<br />ejector station including, new grinder pumps with slide rail system, bypassing, ejector rehabilitation, and
<br />electrical work necessary to connect new pumps.
<br />San Luis Rey Water Reclamation Facility Major Upgrades Project, City of Oceanside, CA
<br />Project Inspector to the City during this project. Provided full-time inspection and administration services
<br />through the project work that included seismic upgrades to the Gravity Belt Thickener Building, replacement of
<br />Aeration Basin Influent and Effluent Gates, replacement of two 30" secondary effluent transfer pipes and
<br />associated gates; coating/lining of Aeration Tank Influent Channel, demolition of abandoned conduit, air piping
<br />and miscellaneous pipe gallery appurtenances; and other demolition and rehabilitation items. Major challenges
<br />on this project included keeping the SLRWRF operational and maintaining permit compliance, which included
<br />the coordination of bypass pumping of 9MGD of mixed liquor.
<br />Suburban Water Systems Plant 224 Reservoirs, City of Whittier, CA
<br />Project Inspector for the construction of two reinforced concrete reservoirs and ancillary infrastructure for
<br />Suburban Water Systems and the City of Whittier. Construction included the north 2.37 MG reservoir, the
<br />south 4.69 MG reservoir, site civil grading, inlet/outlet piping ranging from 16" to 30", storm drains and site
<br />landscaping. Monitoring included Caltrans coordination and coordination with oversight agency contractor(s).
<br />Total construction contract was $11 M with a two-year duration.
<br />Sewer Relocations for the Interstate 6 HOV/Empire Avenue Interchange Project — at Empire Avenue
<br />and Empire Center, City of Burbank, Burbank, CA
<br />Project Inspector for the construction of 10" through 21" PVC gravity sewer main on Empire Avenue and
<br />Victory Place and construction of 10" through 21" PVC gravity sewer main through the City of Burbank public
<br />utility easement through privately owned shopping center in the Empire Center. Work included sewer
<br />C7a..... nssa�tates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 72
<br />
|