Rick Wiggins
<br />Senior Construction Inspector
<br />manholes, tie-ins to existing sewer manholes, abandonment of existing sewer facilities, surface restoration,
<br />landscape and irrigation replacement, and traffic control.
<br />Alley Services Connection Conversion Lewis & Lemon Avenues — Phase ll, Long Beach Water
<br />Department, Long Beach, CA
<br />Project Inspector for the construction and connection of new copper water service lines from water meters
<br />furnished by LBWD to existing residences, cutting and plugging of existing water service lines, and surface
<br />restoration, including abandonment of existing CIP water mains in the alleys between California Avenue and
<br />Lemon Street, and traffic control necessary to complete the work.
<br />Construction of 8" Water Main on the 3000-3100 Blocks of Santa Carlotta Street and Cloud Avenue
<br />from Paraiso Way to Santa Carlotta Street, Project E-911, Crescenta Valley Water District, La
<br />Crescenta, CA
<br />Project Inspector for the installation of 8" steel water mains on the 3000 blocks of Santa Carlotta Street and
<br />Cloud Avenue between Santa Carlotta Street and Paraiso Way within the County of Los Angeles. Work
<br />included excavation, backfill, trench resurfacing, and installation of water mains, water services, fire hydrants,
<br />traffic control, and other appurtenant work.
<br />Well No. 15, City of Paramount, Paramount, CA
<br />Project Inspector for the construction of a new water well and related pumps, motors, valves, controls, and
<br />communications equipment necessary to deliver water from the well to the adjacent water transmission facility;
<br />the construction of a secondary well head treatment system to remove iron, manganese and arsenic from the
<br />water prior to distribution; and the construction of a storm drain and sewer connections for collecting,
<br />transporting, and/or disposing of runoff. The sewer connection will also be used to dispose of the contaminants
<br />removed from the water through the Treatment System. The well will have the capacity to pump 2,000 to 3,000
<br />gallons per minute (gpm).
<br />Sewer Rehabilitation #08-04 Project, City of Hawthorne, Hawthorne, CA
<br />Project Inspector for the rehabilitation and lining of sewer manholes, and sewer main point repairs which
<br />included removal of sections of damaged sewer main and replacing with new piping. Project also involved the
<br />removal of large sections of 8" VCP sewer main and replacing with new, larger diameter piping, 10" and 12"
<br />VCP (upsizing), as well as sewer main lining to damaged sewer mains.
<br />Peacock Hills Service Area Pressure Regulating Station, City of Oceanside, Oceanside, CA
<br />Project Inspector for the expansion, upgrade, and installation of a new pressure regulating station facility. This
<br />project involved the construction of an aboveground concrete masonry unit building on a belowground
<br />reinforced concrete slab and wall structure to house pipe lines, telemetry (SCADA) equipment, electrical and
<br />instrumentation equipment, CLA-VAL regulating valves, butterfly and gate valves, air and vacuum valves,
<br />manual air release valves, bridge and jib cranes, and other appurtenances. The pipeline work included the
<br />installation and testing of CML&C steel pipe and fabricated steel fittings and connections to the existing City of
<br />Oceanside facilities. The project also included upgrading the existing pressure regulating vault and converting
<br />it into a meter vault facility including magnetic flow meters, valves, electrical upgrades, and roof and wall
<br />retrofits. Other items of work included by-pass piping and appurtenances, grading, trench and structure
<br />excavation and backfill, site improvements, and excavation safety measures.
<br />Construction of Channel Crossing Over Big Dalton Wash on Grand Avenue, City of Glendora,
<br />Glendora, CA
<br />Project Inspector for the installation of 16" diameter CML steel welded pipe over Big Dalton Wash along with
<br />16" CL&C weld -on wells. Project also included pile -drilling and placement of rebar enforced concrete pile and
<br />pile caps on both the North and South side of Big Dalton Wash for support of 16" CML steel pipe crossing over
<br />wash.
<br />Arsenic Treatment Plant Well 27, City of Lakewood, Lakewood, CA
<br />Project Inspector for the Arsenic Treatment Plant consisting of three 22' by 7' diameter horizontal filter vessels
<br />and a chemical treatment system which are to be constructed within concrete containment bays complete with
<br />chemical dosing pumps and piping equipment. This system is intended to monitor chlorine residual, turbidity
<br />and pH. The treatment plant will have a bolted steel backwash holding tank with a recycling pumping system.
<br />The system will operate automatically and utilize its own effluent for backwash water. The filter final effluent will
<br />be conveyed to an on -site existing potable storage tank.
<br />IlaS.+nsswwes City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 73