Laserfiche WebLink
Gordon Lewis <br />Senior Construction Inspector <br />Cathedral City Cove Pipeline, Cathedral City, CA <br />Construction Inspector for a mile and a half of 8" distribution line through a hillside residential community within <br />alluvial soil type through City streets stepping through three separate pressure zones. Project included <br />connections to storage tanks and booster stations. Duties included the oversight of alignment, 8" main <br />installation, traffic control compliance, service lateral installation, connections to storage tanks and booster <br />stations, testing and disinfection, and street pavement replacement. <br />Palm Springs Mesa Pipeline, Palm Springs, CA <br />Project Engineer/Inspector for this mile long 12"pipeline installation project through a hillside residential area. <br />The area is served by a booster located at the southern end of the city. Streets are narrow and pipeline <br />excavation was complicated by boulders. Traffic and construction were often in conflict due to the narrow <br />streets. As Engineer and Inspector, scheduling was critical in order to minimize inconvenience and maintain <br />ingress and egress to homeowners. In addition to the pipeline, the project included thrust protection and air <br />relief valves. Project responsibilities included project documentation, administration of contract change orders <br />and progress payments, coordination with city staff and public, as-builts and utility coordination. <br />Murray Canyon/South Palm Canyon Pipeline P, Palm Springs, CA <br />Project Engineer/Inspector for this mile long 12"CMLC pipeline. It connected into elevated storage and was <br />used primarily to strengthen the area's existing 8" distribution piping and included street pavement <br />replacement. Project duties included compliance with plans and specifications, coordination with City officials, <br />review traffic control plans, perform testing and disinfection. Project responsibilities included project <br />documentation, administration of contract change orders and progress payments, coordination with City staff <br />and public, as-builts and utility coordination. <br />Las Palmas (Old Movie Colony) Pipeline, Palm Springs, CA <br />Project Engineer/Inspector for this two-year main line construction. Project was divided into two consecutive <br />contracts and completed by two contractors. The pipelines consisted mainly of 8" CMLC ductile iron and a <br />small section of 12"CMLC ductile iron piping. The new piping was tied into existing mains. The total length <br />installed was approximately 25,000'. Duties as Inspector and Engineer included the design, contract bid and <br />award, compliance with plans and specs, coordination with City officials, traffic control compliance, service <br />lateral and air relief valve installation, testing and disinfection, and street pavement replacement. Project <br />responsibilities included project management, construction contract administration, project documentation, <br />administration of contract change orders and progress payments, coordination with City staff and public, as- <br />builts and utility coordination. <br />Monterey Peninsula Water Supply Project, Cal American Water, Monterey, CA <br />Senior Construction Inspector on the pipeline portion of this $320M program. The overall project consists of <br />slant intake wells, a desalination plant, and related facilities. The project requires the installation of seven miles <br />of pipeline through two cities that will connect the new desalination facility to the Pure Water facility. In addition <br />to street and sidewalk trenching, 36" DIP pipe installation, backfilling soils and repaving the roadway, <br />construction activities include underground utility location, relocating conflicting pipelines and traffic control. <br />Duties include observing and documenting construction staging, traffic control and field activities. Extensive <br />coordination with residents, businesses, multiple City contacts, stakeholders and wet and dry utility companies <br />is also required. <br />Lift Station Project, City of Corona, CA <br />Resident Inspector for this developer driven lift station in support of new 150-unit development project. Project <br />features include rerouting flow, construction of new inlet and outlet piping, concrete and masonry structure to <br />house the pump station and controls, parking lot improvements, lighting, fencing, sidewalk, curb and gutter, <br />landscaping, irrigation, drainage, roadway improvements and utility conduit construction. Duties included <br />preparation of daily reports, photographic records, construction contract administration, contract compliance, <br />review of submittals, quantity take offs, coordination with City Project Manager and Inspection Supervisor for <br />this project. <br />Rock Vista Road Drainage, Corona, CA <br />Resident Inspector for this $250K drainage project. Project included street work, curb and gutter, paving, <br />trenching, and catch basin construction. Duties include preparation of daily reports, photographic records, <br />C7IIsoclates <br />- .... City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 76 <br />