Laserfiche WebLink
Robert Peters <br />Senior Construction Inspector <br />Mr. Peters has over 29 years of experience in the field of Construction Experience <br />Management and Inspection. He has served as Superintendent and 29 years <br />Inspector for numerous projects involving major infrastructure such as Education <br />treatment plants, sewage lift stations, pump stations, roadway AA, Saddleback College, Mission <br />construction, deep trench excavation in major arterial streets, storm drains, Viejo, CA <br />storm sewers, primary street improvements and conventional dry utilities. Registrations/Certifications <br />The construction costs for these projects have ranged up to $200M. He 1ahour OSHA <br />has worked for public agencies and has tremendous internal operations 30-hour OSHA <br />and maintenance experience and expertise. Bob is very familiar with public Surveying and Construction <br />agency work and paperwork required to complete these types of Seminars Technology <br />infrastructure projects within cities and remote areas. Typical project <br />responsibilities include a thorough understanding of the plans, <br />specifications, and contract documents, monitoring and updating schedules, conducting weekly construction <br />meetings, field verification and progress billings, negotiation of change orders and procurement of materials. <br />He has strong working knowledge of local City and regional green book standards. <br />Butterfield Recycled Water Line Project, City of Corona, CA <br />Resident Inspector during the installation of 24" HDPE and 20" DIP recycled water line between Norco and <br />Corona adjacent to the Corona Municipal Airport. Project value was $2.2M and features included direction <br />drilling on a two-12 hourshifts, 7 days a week to complete the 2,400' of 24" HDPE and 24" DIP connection. <br />Duties included coordination with City Project Manager, Airport Manager and inspection staff as well as <br />paleontology, materials testing and environmental consultants, preparation of daily reports, photographic <br />records, construction contract administration, quantity take offs and contract compliance. <br />Wastewater Treatment Plant Upgrade, Irvine Ranch Water District, Irvine, CA <br />Resident Inspector for $30M wastewater treatment plant upgrade. Duties included coordination with City <br />Project Manager, inspection management staff, materials testing and environmental consultants, preparation of <br />daily reports, photographic records, construction contract administration, quantity take offs and contract <br />compliance. <br />Multiple Projects, Orange County Sanitation District, Fountain Valley, CA <br />Senior Construction Inspector for 20 years with responsibilities that included assisting consultants, contractors <br />and project managers with all phases of highly complex construction and rehabilitation projects at water and <br />sewage treatment facilities. Reviewed construction plans and drawings for accuracy, constructability, <br />compatibility, errors and omissions. Identified problem areas and possible conflicts, and suggest solutions. <br />Assisted Resident Engineer with approval and/or tracking of any change orders and Project Engineers with <br />cost estimates of design changes forced by construction problems. Coordinated construction isolation <br />requirements and schedule plant shut -downs with other departments. Advised all necessary parties on the <br />impact of construction on plant maintenance and the waste treatment process. Worked closely with safety <br />representatives to analyze job hazards, monitor progress and safety of all employees throughout the <br />construction process. Performed start-up and testing of all new and existing facilities after construction is <br />complete. Inspected mechanical pumps, lift stations, HVAC equipment, force main pumping, coatings, shoring, <br />water -proofing, reinforced steel, concrete, mechanical devices, masonry, sandblasting, painting, force -main -to - <br />gravity piping from 10"to 42", VCP, concrete, ductile and HDPE piping. Managed outside laboratories for QC <br />and compliance testing per submittals. Maintained documentation of all inspection reports, design changes, <br />field test results and project logs. Provided guidance to a staff of junior inspectors. Oversaw the excavation and <br />construction of multiple below -ground pump stations in the City of Newport Beach, valued between $9M and <br />$30M. Provided inspection during all stages of construction of the primary and secondary construction projects <br />at both the Fountain Valley and Huntington Beach treatment plants. <br />Orange County Sanitation District, Rocky Point Lift Station, Newport Beach, CA <br />Resident Inspector for $8M lift station. Project included dewatering wells, placement of sheet piles for shoring, <br />20' excavation below street grade, structural concrete walls and deck of pump station and wet well, installation <br />of force main and gravity sewer, installation of four 25 hp pumping units and related piping, installation of T- <br />lock lining in wet well and the sandblasting and painting of all piping on job site, masonry block building for <br />switchgear and vfd's, coordinated taking old pump station off line and start- up of new pump station. Duties <br />C7a11aaclates <br />...... City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 78 <br />