Robert Peters
<br />Senior Construction Inspector
<br />Mr. Peters has over 29 years of experience in the field of Construction Experience
<br />Management and Inspection. He has served as Superintendent and 29 years
<br />Inspector for numerous projects involving major infrastructure such as Education
<br />treatment plants, sewage lift stations, pump stations, roadway AA, Saddleback College, Mission
<br />construction, deep trench excavation in major arterial streets, storm drains, Viejo, CA
<br />storm sewers, primary street improvements and conventional dry utilities. Registrations/Certifications
<br />The construction costs for these projects have ranged up to $200M. He 1ahour OSHA
<br />has worked for public agencies and has tremendous internal operations 30-hour OSHA
<br />and maintenance experience and expertise. Bob is very familiar with public Surveying and Construction
<br />agency work and paperwork required to complete these types of Seminars Technology
<br />infrastructure projects within cities and remote areas. Typical project
<br />responsibilities include a thorough understanding of the plans,
<br />specifications, and contract documents, monitoring and updating schedules, conducting weekly construction
<br />meetings, field verification and progress billings, negotiation of change orders and procurement of materials.
<br />He has strong working knowledge of local City and regional green book standards.
<br />Butterfield Recycled Water Line Project, City of Corona, CA
<br />Resident Inspector during the installation of 24" HDPE and 20" DIP recycled water line between Norco and
<br />Corona adjacent to the Corona Municipal Airport. Project value was $2.2M and features included direction
<br />drilling on a two-12 hourshifts, 7 days a week to complete the 2,400' of 24" HDPE and 24" DIP connection.
<br />Duties included coordination with City Project Manager, Airport Manager and inspection staff as well as
<br />paleontology, materials testing and environmental consultants, preparation of daily reports, photographic
<br />records, construction contract administration, quantity take offs and contract compliance.
<br />Wastewater Treatment Plant Upgrade, Irvine Ranch Water District, Irvine, CA
<br />Resident Inspector for $30M wastewater treatment plant upgrade. Duties included coordination with City
<br />Project Manager, inspection management staff, materials testing and environmental consultants, preparation of
<br />daily reports, photographic records, construction contract administration, quantity take offs and contract
<br />compliance.
<br />Multiple Projects, Orange County Sanitation District, Fountain Valley, CA
<br />Senior Construction Inspector for 20 years with responsibilities that included assisting consultants, contractors
<br />and project managers with all phases of highly complex construction and rehabilitation projects at water and
<br />sewage treatment facilities. Reviewed construction plans and drawings for accuracy, constructability,
<br />compatibility, errors and omissions. Identified problem areas and possible conflicts, and suggest solutions.
<br />Assisted Resident Engineer with approval and/or tracking of any change orders and Project Engineers with
<br />cost estimates of design changes forced by construction problems. Coordinated construction isolation
<br />requirements and schedule plant shut -downs with other departments. Advised all necessary parties on the
<br />impact of construction on plant maintenance and the waste treatment process. Worked closely with safety
<br />representatives to analyze job hazards, monitor progress and safety of all employees throughout the
<br />construction process. Performed start-up and testing of all new and existing facilities after construction is
<br />complete. Inspected mechanical pumps, lift stations, HVAC equipment, force main pumping, coatings, shoring,
<br />water -proofing, reinforced steel, concrete, mechanical devices, masonry, sandblasting, painting, force -main -to -
<br />gravity piping from 10"to 42", VCP, concrete, ductile and HDPE piping. Managed outside laboratories for QC
<br />and compliance testing per submittals. Maintained documentation of all inspection reports, design changes,
<br />field test results and project logs. Provided guidance to a staff of junior inspectors. Oversaw the excavation and
<br />construction of multiple below -ground pump stations in the City of Newport Beach, valued between $9M and
<br />$30M. Provided inspection during all stages of construction of the primary and secondary construction projects
<br />at both the Fountain Valley and Huntington Beach treatment plants.
<br />Orange County Sanitation District, Rocky Point Lift Station, Newport Beach, CA
<br />Resident Inspector for $8M lift station. Project included dewatering wells, placement of sheet piles for shoring,
<br />20' excavation below street grade, structural concrete walls and deck of pump station and wet well, installation
<br />of force main and gravity sewer, installation of four 25 hp pumping units and related piping, installation of T-
<br />lock lining in wet well and the sandblasting and painting of all piping on job site, masonry block building for
<br />switchgear and vfd's, coordinated taking old pump station off line and start- up of new pump station. Duties
<br />C7a11aaclates
<br />...... City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 78
<br />
|