Laserfiche WebLink
Robert Peters <br />Senior Construction Inspector <br />included preparation of daily reports, photographic records, contract compliance, review of submittals, quantity <br />take offs, and the coordination with City and Sanitation PM's and inspection supervisor. <br />A Street & 14th Street Pump Stations, Orange County Sanitation District, Newport Beach, CA <br />Resident Inspector for this $5M project for two new pump stations. Project features included soil -cement trench <br />walls used as water barrier around pump station, concrete underwater seal slab, reinforcing -steel, waterstop, <br />concrete floor, walls and deck, waterproofing on all underground walls, concrete protection in wet well, three 5 <br />hp and three 10 hp pumps, masonry block building for switch gear and vfd's, tie-in of old and new pump <br />stations, startup of new pump stations, demolition of old pump stations, installation of force mains and gravity <br />sewers. Duties included contract compliance, preparation of daily reports, approving progress payment, review <br />submittals, take offs and take photographic records and coordination with OCSD and City Project Managers <br />and Inspection Supervisor. <br />Steve Anderson Pump Station - Orange County Sanitation District, Fountain Valley, CA <br />Resident Inspector for this new $12M pump station. Project features included installing sheet piles and tie- <br />backs for shoring, dewatering wells, 40' excavation to subgrade below street grade, placing of forms, <br />reinforcing steel, waterstop, and concrete for 6' thick floor slab and up to 6' thick walls, water proofing for walls <br />and Mock for interior walls of wet well, installing four-50hp pumps, and piping above and below grade, tie-in to <br />new 60" sewer coming into wetwell, jack and bore for 48" discharge line to OCSD headwork's, construction of <br />masonry block building for switchgear and vfd's. Duties included contract compliance, prepared daily reports, <br />approved progress payment, review submittals, take offs, take photos and coordination with OCSD Project <br />Manager and Inspection Supervisor. <br />Staff Augmentation Inspection, City of Irvine, CA <br />Senior Construction Inspector for various CIP and Land Development projects. Projects included grading and <br />storm drains, street work and roadway widening projects, annual slurry and paving programs, bridges and <br />structures, landscaping and median work and dry utilities. Duties included coordination with City Inspection <br />Supervisor and Senior Inspectors, materials testing and environmental consultants, preparation of daily <br />reports, photographic records, construction contract administration, quantity take offs and contract compliance. <br />Foothill Parkway Landscaping, City of Corona, CA <br />Resident Inspector for this $30M roadway project in the City of Corona. Duties included inspection for the $2M <br />project landscaping along this two-mile new grant funded roadway. Also responsible for coordination with City <br />Project Manager, Site Construction Manager, coordination with materials testing, preparation of daily reports, <br />photographic records, construction contract administration, quantity take offs and contract compliance. <br />City of Irvine, City Hall Fueling Station Project, Irvine, CA <br />Resident Inspector for this $1 Mtwo-tank fueling station at the main city hall for use in fueling city fleet vehicles. <br />Project included removal of old tanks and installation of two new tanks (regular and diesel fuel) and new island <br />and pumping stations. Project features included relocating other utilities, landscaping and irrigation <br />improvements. Duties included preparation of daily reports, photographic records, construction contract <br />administration, contract compliance, review of submittals, quantity take offs, coordination with City Project <br />Manager and Inspection Supervisor for this high -profile project. <br />San Diego River Channel Rehabilitation Project, City of Irvine, CA <br />Resident Inspector for this $1 M rehabilitation of sidewalks and pipe crossing within the channels <br />environmentally sensitive areas. Work included structural concrete, cut off walls, rip -rap, shotcrete, grading and <br />coordination with environmental consultants for work in sensitive channel areas. Duties included preparation of <br />daily reports, photographic records, construction contract administration, contract compliance, review of <br />submittals, quantity take offs and coordination with City Project Manager and Inspection Supervisor. <br />i^.alallacemssodates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 79 <br />