My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WALLACE AND ASSOCIATES CONSULTING, INC-2020
Clerk
>
Contracts / Agreements
>
W
>
WALLACE AND ASSOCIATES CONSULTING, INC-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:30:25 AM
Creation date
5/6/2020 4:21:29 PM
Metadata
Fields
Template:
Contracts
Company Name
WALLACE AND ASSOCIATES CONSULTING, INC
Contract #
A-2020-076-04
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
1/17/2024
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thomas Hall <br />Senior Construction Inspector <br />Monte Olivio Residential Development Project, City of Corona, CA <br />Senior Construction Inspector on a 60+ acre development in South Eastern Corona. This development <br />included 106single-family residential lots, associated roadways and infrastructure, and a <br />mitigation/conservation area for the restoration of streambed habitat. The project removed an existing sewer <br />treatment plant and installed new pipelines to tie into the existing City sewer system, installed a temporary 8" <br />reclaimed water line that extended one mile from the project site and installed of 1,000' of 8" PCP. Extensive <br />granite removal had to occur for the placement of 1,000'of 60" RCP. Part of the work was being completed <br />adjacent to an open channel which required environment mitigation and protection. <br />Metro Center Development Inspection, City of Corona, CA <br />Resident Inspector for the $50M mixed use development project in the heart of Corona. Project is adjacent and <br />surrounded by the 91 freeway and active railroad tracks. Project features include mass grading, two new <br />parking structures, commercial buildings, street and road improvements, new storm drain, new waterline <br />construction, relocation of existing utilities, retaining walls, lighting, traffic signals, striping, landscaping and <br />irrigation. Duties included quality assurance for all underground work, oversight of materials testing for grading <br />and utility trench, daily reports, job photos and coordination with City utility department. <br />Clallace: Associates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.