Thomas Hall
<br />Senior Construction Inspector
<br />Mr. Hall has over 29 years of experience in the engineering and
<br />construction industry. Tom began his career working for a local city as an
<br />Engineering Technician, then he worked his way up to Supervising
<br />Inspector with up to eight inspectors reporting to him. He has a strong
<br />operations background in public works and water/wastewater projects.
<br />Tom's experience includes inspecting and managing the construction of
<br />facilities in the area of water, sewer and recycled water which includes
<br />pipelines, sewer lift stations, plant head works, reservoirs, PRV stations
<br />and booster stations. He is able to resolve field and operational issues
<br />related to the construction of infrastructure projects through a very detailed
<br />knowledge of the systems' operational requirements, construction
<br />contractors' means and methods, and by developing and maintaining good
<br />working relations with contractors, agency staff and other local agencies to
<br />effectively complete projects. Tom brings significant experience in
<br />managing materials testing and geotechnical consultants and preparing
<br />testing plans for projects.
<br />Experience
<br />29 years
<br />Education
<br />Public Works Inspector
<br />Certification, Rancho Santiago
<br />College
<br />Registrations
<br />Water Distribution D-3, DHS #8071
<br />Cross -Connection Control
<br />Specialist
<br />Water Treatment T-2
<br />Backflow Certification Training
<br />Trench Excavation Safety
<br />Confined Space Training
<br />OSHA 10
<br />Butterfield Recycled Waterline Project, City of Corona, CA
<br />Supervising Inspector for this $2.2M 24" HDPE and 20" DIP recycled water
<br />line between Norco and Corona adjacent to the Corona Municipal Airport. The project features include
<br />directional drilling on a 12-hour shift, seven days a week to complete the 2,400' of 24" HDPE and 24" DIP
<br />connection. Duties included coordination with City Project Manager, Airport Manager and inspection
<br />management staff as well as paleontology, materials testing and environmental consultants. Duties included
<br />review of daily reports, photographic records, construction contract administration and contract compliance.
<br />Masters Drive Recycled Waterline Project, City of Corona, CA
<br />Supervising Inspector for the 2.3' long recycled waterline through City streets. This $2.5M CIP project included
<br />8" and 12" Ductile Iron Pipe (DIP) recycled lines to allow for use of recycled water at City facilities including
<br />parks and other landscaped areas. Pipe was constructed with restrained joints and is double bagged for
<br />corrosion protection. Project includes various tie-ins, pressure testing, chlorination and flushing, valves,
<br />appurtenances and meter installations. Duties included oversight of quality control for construction, preparing
<br />daily inspection reports, photo records and bid item quantity calculations, and checking contractor's stormwater
<br />BMP's were in place. Monitored traffic control for conformance with specific traffic control plans and the
<br />WATCH manual.
<br />El Cerritos Road Waterline Replacement Project, City of Corona, CA
<br />Supervising Inspector for this $1 M24" DIP waterline replacement project. Provided inspection and coordination
<br />of replacement of steel water mains, residential services, air -vacs and fire hydrants for the City of Corona in
<br />unincorporated Riverside County. This project included about 2,500' of pipeline, street demolition and
<br />reconstruction, curb and gutter, coordinating materials testing and surveying representatives, handling citizen
<br />issues, tie-ins, de-chlorinization, BAC-T testing and flushing of three separate water zones. Project role
<br />included working closely with the County of Riverside.
<br />Cajalco Recycled Water Line Project, Corona, CA
<br />Senior Construction Inspector for this six -block new pipeline project. Project features include 6", 8" and 12" DIP
<br />recycled water mains, blow -offs and air -vacs, paving, and curbs and gutters. Duties included oversight of
<br />quality control for construction, preparing daily inspection reports, photo records and bid item quantity
<br />calculations, and checking contractor's stormwater BMP's were in place.
<br />Ontario Water Line Project, Corona, CA
<br />Senior Construction Inspector for this '/ mile pipeline project. Project consisted of installing 12" DIP water
<br />mains, blow -offs, fire hydrants, service connections and air -vacs. Project also included trench compaction,
<br />paving, curbs and gutters. Duties included oversight of quality control for construction, preparing daily
<br />inspection reports, photo records and bid item quantity calculations, and coordination with DWP operations
<br />staff.
<br />Wallace. -Associates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 80