TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />e. Relevant Project Experience <br />Quadrant III Water Main Replacements <br />City of Chino, CA <br />TAIT has provide design services to the City of Chino for approximately <br />7000 linear feet of new 8-inch PVC water line replacing a similar length of <br />50-year old 6-inch ACP lines within 13 residential street. Over 170 <br />customers will be affected during construction. The City required that all <br />points of connection to be upgraded to include the newer and larger PVC <br />water pipe and the installation of new water values in each cross street. <br />Eight of the thirteen segments require obtaining approvals from the State <br />Division of Drinking Water due to restricted horizontal clearances in the <br />narrow residential streets. To assist the City in meeting an early delivery <br />schedule for one of their current water projects Quadrant III water plans <br />were separated into two separate bid contracts. The first segment of 2800 <br />LF was recently awarded at a low bid price of $990,000 and construction <br />commenced in April 2018 and completed in 6 months. The second bid <br />package received City authorization to advertise in February 2018 and was <br />constructed in 2018. <br />Hoover, Toll, Keppel Recycled Water Project <br />Glendale Water & Power, Glendale, CA <br />TAIT was contracted to provide design build services with 1DC for the <br />recycled water project within the Glenwood residential neighborhood and <br />surrounding schools. The project was located in residential streets in an <br />area of Glendale which required our team to develop construction <br />documents that could accommodate traffic for three public schools and a <br />design that would work with many existing utilities. The design involved <br />the preparation of plans and specifications for approximately 5,890linear <br />feet of 8-inch recycled water pipeline to bring recycled waterto GWP's <br />customers in the area. In addition, the project provided enough capacity <br />for future extension and expansion. TAIT provided the design services <br />along with topographical survey of the neighborhood. Due to the <br />numerous existing utilities and mains within the project, detailed designs <br />were provided to ensure adequate clearance between all utilities. <br />1I TAIT <br />Client: <br />City of Chino <br />Reference: <br />Lupe Camacho <br />13220 Central Avenue <br />Chino, CA 91710 <br />Icamacho@citvofchino.or¢ <br />(909)334-3406 <br />Construction Cost: <br />$2.3 million <br />Project Dates: <br />Design: May 2017-Jan. 2018 <br />Construction: 2018 <br />Project Team: <br />PIC: Jacob Vandervis <br />PM: Todd Schmieder <br />PE: Samantha Wohlfarth <br />QA/QC: David Sloan <br />Client: <br />Glendale Water & Power <br />Reference: <br />Kevin Runzer <br />141 N. Glendale Ave. <br />Glendale, CA 91206 <br />krunzer@alendaleca.gov <br />(818)551-6910 <br />Construction Cost: <br />Approx. $1.69 M <br />Project Dates: <br />Design: 2016-2017 <br />Construction: 2017 <br />Project Team: <br />PIC/PM: Jacob Vandervis <br />QA/QC: Todd Schmieder <br />PE: Samantha Wohlfarth <br />Page 17 <br />