-` TAIT & Associates, Inc. <br />P On -Call Water Resources Engineering Services <br />Kenneth and Ben Lomond Water Main <br />Replacement Projects <br />Glendale Water & Power, Glendale, CA <br />TAIT was contracted to provide design build services with JDC for the <br />Kenneth and Ben Lomond neighborhoods water main replacement <br />projects. The project was located in residential streets in an area of <br />Glendale which required our team to develop construction documents <br />that could accommodate traffic while working in residential streets and a <br />design that would work with many existing utilities. The existing water <br />mains in the Kenneth and Ben Lomond neighborhoods were 40-50 years <br />old and were deteriorated and made with unlined cast-iron. The design <br />involved the preparation of plans and specifications for the replacement <br />and installation of approximately 11,340 linear feet of new 12-inch and fl- <br />inch diameter ductile -iron water mains. Existing galvanized and copper <br />services smaller than 1 inch were replaced with 1-inch copper <br />services. Existing fire hydrants were replaced and spacing was decreased <br />to provide current fire protection to the neighborhood. TAIT provided the <br />design services along with topographical survey of the long <br />neighborhood. <br />Foothill District Water Main Replacements <br />Golden State Water Company, Foothill District <br />Construction Cost for the six (6) Foothill Projects: <br />• City of Claremont -Indian Hill Blvd. $350,400 <br />• County of LA -Mangrove Ave$332,700 <br />• City of San Dimas -Baseline Well, $304,500 <br />• County of LA -Lenore Ave., $707,950 <br />• County of LA-Marshburn Ave, $677,800 <br />• County of LA-Kelburn Ave., $372,500 <br />TAIT was the Designer of Record for these six projects for Golden State <br />Water Company (GSWC). TAIT provided the survey and design services <br />for the replacement of 13,200 lineal feet of various sizes (4, 6, 8-inch steel <br />water main) for the Foothill District. The existing lines, having been <br />installed in the 40's, were in poor condition and were not providing <br />proper service to the GSWC customers. GSWC was looking for a <br />streamlined construction schedule and therefore went with a Design Build <br />process for each of these projects. To stream line the work further, GSWC <br />packaged several projects into a single contract. This contract included a <br />total of six water main replacement projects that cover residential <br />neighborhoods, commercial customers, and work in major roadways. <br />'I TAIT <br />Client: <br />Glendale Water & Power <br />Reference: <br />Kevin Runzer <br />141 N. Glendale Ave. <br />Glendale, CA 91206 <br />krunzerCccDgiendaleca.gov <br />(818)551-6910 <br />Construction Cost: <br />Approx. $3.12 M <br />Project Dates: <br />Design: 2015-2016 <br />Construction: 2016 <br />Project Team: <br />PIC/PM: Jacob Vandervis <br />PE: Samantha Wohlfarth <br />QA/QC: Todd Schmieder <br />Client: <br />Golden State Water Company <br />Reference: <br />Adrian Combes, P.E. <br />(714) 535-7711 ext. 211 <br />Adrian.combes@gswater.com <br />Construction Cost: <br />$2.6 M <br />Project Dates <br />Design: 2013 <br />Construction: 2013 <br />Project Team: <br />PIC/PM: Jacob Vandervis <br />DE: Samantha Wohlfarth <br />QA/QC: Todd Schmieder <br />Page 18 <br />