Laserfiche WebLink
TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />Beaudry Terrace Water Main Replacement <br />Glendale Water & Power, Glendale, CA <br />TAIT was contracted to provide design build services with JDC for the <br />Beaudry Terrace neighborhood water main replacement project. The <br />project was located in residential streets in a hilly part of Glendale which <br />required our team to develop construction documents that could <br />accommodate traffic while working in narrow residential streets. <br />The existing water mains in the Beaudry Terrace neighborhood were 40- <br />50 years old and were deteriorated and made with unlined cast-iron. The <br />design involved the preparation of plans and specifications for the <br />replacement and installation of approximately 5,300 linear feet of new <br />12-inch, 8-inch, and 6 inch diameter ductile -iron water mains. Existing <br />galvanized and copper services smaller than 1 inch were replaced with f- <br />inch copper services. Existing fire hydrants were replaced and spacing <br />was increased to provide current fire protection to the neighborhood. <br />TAIT provided the design services along with topographical survey of this <br />hilly neighborhood. Due to the hilly nature of the project, retaining walls <br />were designed at some of the hydrants to ensure adequate clearance was <br />provided between the hydrant and the adjoining slopes. <br />f. References <br />City of Chino <br />Lupe Camacho <br />(909)334-3406 <br />13220 Central Avenue <br />Chino, CA 91710 <br />Projects: Quadrant 111 Water Main Replacement <br />Glendale Water & Power <br />Client: <br />Glendale Water & Power <br />Reference: <br />Shad Rezai <br />141 N. Glendale Ave., Level <br />Glendale, CA 91206 <br />(818) 548-3982 <br />srezai(@glendaleca.gov <br />Construction Cost: <br />$1.56 M <br />Project Dates: <br />Design:2014-2015 <br />Construction: April 2015 <br />Project Team: <br />PIC: Jacob Vandervis <br />PM: Kimberly Johnson <br />DE: Samantha Wohlfarth <br />QA/QC: Todd Schmieder <br />Andy Cheung <br />(818)551-6909 <br />141 N. Glendale Ave., Level <br />Glendale, CA 91206 <br />Projects: Hoover, Toll, Keppel Recycled Water Project, Kenneth and Ben Lomond Water Main Replacements <br />Project, Adams Hill Neighborhood Water Main Replacement Project, Beaudry Terrace Water Main <br />Replacement Project <br />Golden State Water Company <br />Conde Ventura, PE <br />(310)436-6950 x102 <br />630 E. Foothill Boulevard <br />San Dimas, CA 91773 <br />Projects: Foothill District Water Main Replacements, Normandie Ave. Water Main Replacement <br />III TAIT Page 110 <br />