Laserfiche WebLink
TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />F Engineer's Quantity and Cost Estimate <br />TAIT will prepare cost estimates at the 60%, 90% & 100% PS&E stage for City review and input. Unit <br />prices will be checked against recent City projects. Work items will be prepared to correlate with the <br />specifications and will include all work items including mobilization, storm water compliance, traffic <br />control and striping. The cost estimate will be reviewed by the CA/QC Manager prior to each submittal <br />per the quality assurance program. <br />Deliverables: <br />✓ 60% Engineer's Cost Estimate (Digital & Hard Copy) <br />✓ 90% Engineer's Cost Estimate (Digital & Hard Copy) <br />✓ 100% Engineer's Cost Estimate (Digital & Hard Copy) <br />G Construction Specifications and Bid Documents <br />TAIT will prepare technical specifications for the proposed project based on the City boilerplate <br />specifications. Each work item will have a clear measurement and payment clause in order to avoid <br />costly change orders during the construction phase. Specifications will also include clear delineation of <br />the traffic control requirements, water pollution control requirements, survey monument protection <br />and replacement requirements, and construction scheduling parameters as well as coordination <br />requirements with utilities. Utility owners, coordination and contact requirements, and additional <br />permitting requirements will also be included in the specifications. The project specifications will be <br />reviewed by the QA/QC Manager prior to each submittal per the quality assurance program. <br />The initial Specification submittal at 60% PS&E will include a single set of the Draft Technical <br />Specifications covering both bid packages that will be used to verify City format requirements. (A <br />separate Bid Schedule for each Bid Set will be provided with the 60% Draft Technical Specifications.) <br />The 90% and 100% Project Specifications will include a separate package for each Bid Set. <br />Deliverables: <br />✓ 60% Draft Project Specifications (Digital & Hard Copy) <br />✓ 90% Project Specifications (Digital & Hard Copy) <br />✓ 100% Project Specifications (Digital & Hard Copy) <br />H Plan Interpretation and Bidding Assistance: <br />This task includes the necessary hours for providing limited bidding assistance to the City during the <br />bidding phase. TAIT will remain available to the City and will respond to Contractor RFIs based on the <br />City's request. This task has been assumed to be billed in a time and material basis. Additional hours <br />and fees may be requested based on the final number of RFIs and correspondence required during the <br />bidding phase. <br />I Construction Support and Shop Drawing Review <br />This task includes the following two sub -tasks <br />�IITAIT Page 117 <br />