Laserfiche WebLink
40 <br />TAIT & Associates, Inc. <br />F On -Call Water Resources Engineering Services <br />Appendix <br />Resumes <br />Jacob Vandervis, PE <br />F11 <br />PRINCIPAL-IN-CHARGEIPROIECT MANAGER <br />Mr. Vandervis currently serves as a Vice President/Chief Operations Officer in <br />TAIT's Corporate Office in Santa Ana. In addition to his management duties, he <br />acts as the primary point of contact for several national retail and residential <br />developers. Mr. Vandervis is a licensed civil engineer with over 33 years of <br />Education <br />B.S. --Civil Engineering <br />experience with land development projects in the western United States. He <br />California State University, <br />has been a member of the TAIT team for the past 22 years. His areas of <br />Long Beach <br />expertise include site design, grading design, water main design, drainage <br />studies, water pollution control plans, erosion & sediment control plans, as well <br />Year of TAIT Team <br />as street improvement plans. He is experienced in site design of all sizes for <br />Enlistment <br />commercial development, involved in preliminary design to develop cost <br />1997 <br />estimates & due diligence packages, as well as experienced in the entitlement <br />Total Experience <br />phase of projects. His surveying experience includes the preparation of ALTA <br />33 <br />and topographic surveys, parcel maps, record of survey and legal descriptions. <br />He is a certified Qualified SWPP Developer (QSD), Certified Development, Design <br />R <br />Registered <br />sered Professional <br />& Construction Professional (CDP) and Certified Retail Property Executive (CRX). <br />Engineer, Civil — California, <br />Foothill Water Main Replacement Project, Los Angeles County, Golden State <br />Oregon, Arizona, Utah, <br />Water Company, Project Manager, 2013 <br />Nevada, North Dakota, <br />Project Manager & Principal in Charge of the work being conducted by all TAIT <br />Washington, Hawaii, and <br />staff to provide Design Engineering Service forthen $2.5 M water main <br />Alaska. <br />replacement project throughout six locations in Los Angeles County for Golden <br />Professional Engineer <br />State Water. Primary responsibilities were to review and stamp water main <br />California No. C46301 <br />replacement plans and specifications, supervise design engineers and <br />coordinate with client and contractor through the design and construction <br />phases. <br />Freeman Ave. Water Line Improvement Projects, Golden State Water Company, Project Manager, 2013 <br />Project Manager and Principal in Charge of the work being conducted by all TAIT staff. The Freeman <br />Avenue Water Line Improvement included approximately 3600 linear feet of water line that was <br />designed to replace existing service pipe mains with 8" ductile iron pipe. The project included new <br />services, hydrants, inverts, tie-ins, and other appurtenances. Department of Public Health waiver <br />exhibits were prepared to the satisfaction of Golden State Water Company for select non -potable and <br />water crossings. <br />�II TAIT _ Appendix Page 121 <br />