My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC-2020-075-08
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC-2020-075-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:54:22 AM
Creation date
5/6/2020 4:22:23 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2020-075-08
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
1/1/1900
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />Normandie Ave. Water Line Improvements, Golden State Water Company, Principal in Charge, 2013 <br />Principal in Charge of the work being conducted by all TAIT staff. The project encompassed the planning <br />and design for a 12" water main replacement in Normandie Ave. in the County of Los Angeles, <br />approximately 1400' linearfeet. Project included new services, hydrants, inverts, tie-ins and other <br />appurtenances. Existing 14" pipe was designed for abandonment. Department of Public Health waiver <br />exhibits were prepared to the satisfaction of Golden State Water Company for select non -potable and <br />water crossings. GWSC project engineer: Conde Ventura. <br />Harbor Blvd. Storm Drain and Street Reconfiguration Project, City of Garden Grove, Principal -in - <br />Charge, 2013 <br />Principal -in -Charge of the work being conducted by all TAIT staff to provide Design Engineering Service <br />for then $500 K water main replacement and utility relocation project and the $ 1 M Street <br />Reconfiguration Project in the City of Garden Grove. Primary responsibilities were to ensure the project <br />was properly staffed and that the work was completed to the satisfaction of both TAIT & Associates as <br />well as the City of Garden Grove. <br />On -Call Engineering Services, Orange County Public Works, Principal -In -Charge, 2010 - Present <br />Principal -in -Charge of the work being conducted by all TAIT staff and sub -consultants to provide Plan <br />Check and On -Call Engineering Services for the County of Orange Planned Communities. Primary <br />responsibilities were to ensure the project is properly staffed and that the work is completed to the <br />satisfaction of both TAIT & Associates as well as the County of Orange. <br />100 Acre Parcel Development El Toro Marine Base, Orange County Public Works, Irvine, CA, Project <br />Director. 2009 — Present <br />Prepared infrastructure assessment of the existing Marine Corps base facilities on the southerly 100- <br />acres that had been closed in recent years. Reviewed existing record documents, met with utility <br />purveyors, inspected existing structures and roadways, and prepared executive summary for <br />presentation to the County of Orange for potential reuse of the facilities. <br />City Hall Underground Fuel Storage Tank Removal and Replacement, City of Irvine, Principal -In - <br />Charge, 2013 <br />As Principal -In -Charge Mr. Vandervis made sure that the project was completed to the satisfaction of <br />the City of Irvine Project Manager. He also made sure that we had qualified staff and resources working <br />the project to be sure that all the deliverables were to a standard that was expected by both TAIT as well <br />as the City of Irvine. <br />Abridged List of Additional Project Experience by Jake: <br />> FBI Training Center, Orange County Public Works, Irvine, CA, Principal -In -Charge and Structural <br />Engineer <br />➢ Foothill Crossing, City of Rancho Cucamonga (Principal -In -Charge) <br />➢ Columbus Square Infrastructure Improvements, City of Tustin, (Principal -In -Charge) <br />➢ Entertainment Park, City of Anaheim (Senior Project Manager) <br />TAIT Appendix Page 122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.