Laserfiche WebLink
Q <br />TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />Normandie Ave. Water Line Improvements, Golden State Water Company, Design Engineer, 2013 <br />The project encompassed the planning and design for a 12" water main replacement in Normandie Ave. <br />in the County of Los Angeles, approximately 1400' linear feet. Project included new services, hydrants, <br />inverts, tie-ins and other appurtenances. Existing 14" pipe was designed for abandonment. Department <br />of Public Health waiver exhibits were prepared to the satisfaction of Golden State Water Company for <br />select non -potable and water crossings. GWSC project engineer: Conde Ventura. <br />Beaudry Terrace Water Main Replacement Project, Glendale Water and Power, Project Design <br />Engineer, 2014 <br />The Beaudry Terrace water main replacement project included four phases, six streets, and <br />approximately 5,300 linear feet of water line that was designed to replace existing service pipe mains <br />with ductile iron pipe. The project included new services, hydrants, inverts, tie-ins, and other <br />appurtenances. Department of Public Health waiver exhibits were prepared for select non -potable and <br />water crossings. The project included a community outreach meetings, service survey coordination, as <br />well as detailed final As -Built submittals. <br />Adams Hill Water Main Replacement Project, Glendale Water and Power, Design Engineer, 2014 <br />The Adams Hill water main replacement project included six phases, 13 streets, and approximately <br />10,620 linearfeet of water line that was designed to replace existing service pipe mains with ductile iron <br />pipe. The project included new services, hydrants, inverts, tie-ins, and other appurtenances. As well, the <br />project included different pressure zones and the installation of a division gate. Department of Public <br />Health waiver exhibits were prepared for select non -potable and water crossings. The project included <br />a community outreach meetings, service survey coordination, as well as detailed final As -Built <br />submittals. <br />Foothill Water Line Improvement Projects, Golden State Water Company, Design Engineer, 2013 <br />The Foothill Improvements included six projects that were designed to replace existing service pipe <br />mains with S" ductile iron pipe. One of the six projects included replacement of the transmission line <br />and reconnection to three existing wells. The total pipe replacement was approximately 13,200linear <br />feet. Multiple agencies reviewed the design plans, including City of San Dimas, City of Claremont, City of <br />Arcadia and the County of Los Angeles in addition to Golden State Water. <br />Monterey Park Marketplace Site Development, Monterey Park Retail Partners, LLC/City of Monterey <br />Park, Project Engineer, 2015- Present <br />TAIT was awarded a contract with the developer, Monterey Park Retail Partners, LLC forthe design of a <br />41 acre retail development within the City of Monterey Park and the City of Montebello. The design of <br />the development includes slope stabilization, retaining wall design, street improvement design, utility <br />installation, overall site development, and over400,000 cubic yards of dirt removal and regrading. The <br />project involves three geotechnical analysis. The geotechnical analysis included recommendations for <br />the design on and nearthe landfill; forthe slope stabilization throughout the site; and for the overall site <br />development and construction. The project utilized detailed retaining wall designs and in some areas, <br />pile designs. These retaining walls and pile designs were specially designed near SCE facilities and <br />towers. Unique construction equipment has been detailed out and coordinated forthis construction. <br />TAIT Appendix Page 124 <br />