<br />TAIT & Associates, Inc.
<br />On -Call Water Resources Engineering Services
<br />Normandie Ave. Water Line Improvements, Golden State Water Company, Design Engineer, 2013
<br />The project encompassed the planning and design for a 12" water main replacement in Normandie Ave.
<br />in the County of Los Angeles, approximately 1400' linear feet. Project included new services, hydrants,
<br />inverts, tie-ins and other appurtenances. Existing 14" pipe was designed for abandonment. Department
<br />of Public Health waiver exhibits were prepared to the satisfaction of Golden State Water Company for
<br />select non -potable and water crossings. GWSC project engineer: Conde Ventura.
<br />Beaudry Terrace Water Main Replacement Project, Glendale Water and Power, Project Design
<br />Engineer, 2014
<br />The Beaudry Terrace water main replacement project included four phases, six streets, and
<br />approximately 5,300 linear feet of water line that was designed to replace existing service pipe mains
<br />with ductile iron pipe. The project included new services, hydrants, inverts, tie-ins, and other
<br />appurtenances. Department of Public Health waiver exhibits were prepared for select non -potable and
<br />water crossings. The project included a community outreach meetings, service survey coordination, as
<br />well as detailed final As -Built submittals.
<br />Adams Hill Water Main Replacement Project, Glendale Water and Power, Design Engineer, 2014
<br />The Adams Hill water main replacement project included six phases, 13 streets, and approximately
<br />10,620 linearfeet of water line that was designed to replace existing service pipe mains with ductile iron
<br />pipe. The project included new services, hydrants, inverts, tie-ins, and other appurtenances. As well, the
<br />project included different pressure zones and the installation of a division gate. Department of Public
<br />Health waiver exhibits were prepared for select non -potable and water crossings. The project included
<br />a community outreach meetings, service survey coordination, as well as detailed final As -Built
<br />submittals.
<br />Foothill Water Line Improvement Projects, Golden State Water Company, Design Engineer, 2013
<br />The Foothill Improvements included six projects that were designed to replace existing service pipe
<br />mains with S" ductile iron pipe. One of the six projects included replacement of the transmission line
<br />and reconnection to three existing wells. The total pipe replacement was approximately 13,200linear
<br />feet. Multiple agencies reviewed the design plans, including City of San Dimas, City of Claremont, City of
<br />Arcadia and the County of Los Angeles in addition to Golden State Water.
<br />Monterey Park Marketplace Site Development, Monterey Park Retail Partners, LLC/City of Monterey
<br />Park, Project Engineer, 2015- Present
<br />TAIT was awarded a contract with the developer, Monterey Park Retail Partners, LLC forthe design of a
<br />41 acre retail development within the City of Monterey Park and the City of Montebello. The design of
<br />the development includes slope stabilization, retaining wall design, street improvement design, utility
<br />installation, overall site development, and over400,000 cubic yards of dirt removal and regrading. The
<br />project involves three geotechnical analysis. The geotechnical analysis included recommendations for
<br />the design on and nearthe landfill; forthe slope stabilization throughout the site; and for the overall site
<br />development and construction. The project utilized detailed retaining wall designs and in some areas,
<br />pile designs. These retaining walls and pile designs were specially designed near SCE facilities and
<br />towers. Unique construction equipment has been detailed out and coordinated forthis construction.