My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC-2020-075-08
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC-2020-075-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:54:22 AM
Creation date
5/6/2020 4:22:23 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2020-075-08
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
1/1/1900
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i) TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />Todd Schmieder, P.E., QSD/P <br />SR. PROJECT MANAGERIQAIQC MANAGER <br />Mr. Schmieder has worked on numerous public infrastructure and private <br />i <br />development projects ranging from small residential and commercial project to <br />a 30-mile long toll road, a 40-acre commercial center and 1000-home master <br />Education <br />planned community. His project experience includes plan check services, <br />B.S. — Civil Engineering <br />preparation of feasibility and site assessment studies, site planning studies and <br />Ohio State University, 1980 <br />preliminary and final design plans, tentative and final maps and environmental <br />Year of Tait Team <br />studies and reports. Mr. Schmiedei's technical experience also includes <br />Enlistment <br />conducting design reviews, development of traffic signing and striping plans, <br />2005 <br />preparation of traffic control and construction staging plans, preparation of <br />construction specifications and cost estimates, and providing construction <br />Total Experience <br />management and inspection. His project management experience includes <br />39 <br />utility coordination, master planning and project scheduling. <br />Certifications <br />Quadrant III Water Line Replacement Project, City of Chino, Project Manager, <br />Professional Engineer <br />2017-2018 <br />California No. C37167 <br />This City project required the replacement of approximately 8000LF of existing <br />Certificate program in light 6-inch ACP water pipe with new 8-inch PVC water pipe within13 local streets for <br />construction and the City. The process included obtaining DDW approvals for 8 of the 13 <br />development management segments. <br />University of California — <br />Foothill Water Line Improvement Projects, Golden State Water Company, <br />Irvine Extension, 2004 QA/QC Manager, 2013 <br />The Foothill Improvements included six projects that were designed to replace <br />Affiliations existing service pipe mains with 8" ductile iron pipe. One of the six projects <br />American Society of Civil included replacement of the transmission line and reconnection to three <br />Engineers, Member existing wells. The total pipe replacement was approximately 13,200 linear feet. <br />Building Industry Association Multiple agencies reviewed the design plans, including City of San Dimas, City of <br />of Orange County, Claremont, City of Arcadia and the County of Los Angeles in addition to Golden <br />State Water. <br />Transportation Committee <br />Member Normandie Ave. Water Line Improvements, Golden State Water Company, <br />Project Manager, 2013 <br />The project encompassed the planning and design for a 12" water main <br />replacement in Normandie Ave. in the County of Los Angeles, approximately <br />1400' linear feet. Project included new services, hydrants, inverts, tie-ins and <br />other appurtenances. Existing 14" pipe was designed for abandonment. <br />Department of Public Health waiver exhibits were prepared to the satisfaction of <br />Golden State Water Company for select non -potable and water crossings. GWSC <br />project engineer: Conde Ventura. <br />1II TAIT Appendix Page 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.