Laserfiche WebLink
` TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />On -call Engineering Services, Orange County Public Works, Sr. Project Manager, 2010 to Present <br />Provided On -call Plan Check Services to OCPW Planned Communities for the review of Developer <br />Submittal for a project in Ladera Ranch Covenant Hills and multiple developer projects in the PA 1 of the <br />Ranch Plan. Serving as the Team Lead for TAIT's consultant team of reviewers, plan review submittals <br />have ranged from Tentative Maps, Site Development Plans, Water Quality Management Plans, Rough <br />and Precise Grading Plans, and Public and Private Street Improvement Plans, Storm Drain Plans and <br />Technical Reports. Responsibilities as the Team Lead, in addition to conducting technical plan <br />acceptance reviews and actual plan checks, includes coordination of the TAIT team members, <br />coordination with the County's management and QA/QC staff members and coordination with the <br />Applicant and their design consultants. <br />Tustin Metrolink Station Redevelopment, City of Tustin/OCTA, Sr. Project Manager, 2009-2011 <br />This OCTA project consisted of the redevelopment of an existing 4-acre Metrolink Station in order to <br />provide parking for 870 vehicles and improve traffic circulation and bus loading operations. Design <br />required preparation of plans for the reconfiguration of the existing surface parking lot for a new five - <br />story parking structure, relocation of sewer, water and storm drain lines, and the installation of storm <br />water treatment devices to satisfy the new storm water discharge permit requirements. Design services <br />required extensive coordination and/or permitting with the City of Tustin, Irvine Ranch Water District, <br />Orange County Sanitation District and the State Water Board. Access to the existing Metrolink platform <br />was maintained throughout construction and the entire station was reopened to the public in November <br />2011. <br />Harbor Blvd. Waterline and Street Reconfiguration Project, City of Garden Grove, Sr. Project Manager, <br />2012-2013 <br />Project Manager of the work being conducted by all TAIT staff to provide Design Engineering Service for <br />then $500 K water main replacement and utility relocation project and the $ 1 M Street Reconfiguration <br />Project in the City of Garden Grove. Primary responsibilities were to review and stamp the plans, <br />supervise engineering team, and attend and coordinate project meetings with City staff and other <br />stakeholders. Project included Providing Plans Specifications and Cost estimate for City improvements to <br />Harbor Boulevard that will accommodate the future redevelopment of several city -owned parcels. This <br />project included reconfiguration of Harbor Boulevard from Palm Street to Lampson Avenue <br />(approximately 1/3-mile total length), improvements to an existing raised median, abandonment of <br />existing 8-inch ACP and 12-inch DIP City water lines, installation of a 800 LF of new 16-inch water line, <br />relocation of SCE and AT&T main distribution service lines, and the installation of new public storm <br />drains, sewer and water services. <br />Abridged List of Additional Project Experience by Todd: <br />➢ Antonio Parkway Widening Improvements, County of Orange <br />➢ A -Town Sewer Capacity Improvements (-2 miles of new sewer mains), City of Anaheim <br />TAIT Appendix Page 126 <br />