My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC-2020-075-08
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC-2020-075-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:54:22 AM
Creation date
5/6/2020 4:22:23 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2020-075-08
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
1/1/1900
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />r ^n On -Call Water Resources Engineering Services <br />Daniela Malott, P.E. <br />PROJECT ENGINEER -DRAINAGE <br />Ms. Malott has a strong civil engineering background with a water resources <br />and surface runoff focus. Her engineering experience includes hydrology, storm <br />drain design, and hydraulics. Her computer modeling background includes the <br />application of the U.S. Army Corps of Engineers HEC-HMS (Hydraulic Modeling <br />System), HEC-SSP (Statistical Software package), and HEC-RAS (River Analysis <br />Education <br />Software), Watershed Modeling System (WMS), Advanced Engineering Software <br />M.S. - Civil Engineering <br />(Hydrology and Water <br />(AES) for hydrologic/hydraulic analysis in Southern California, Water Surface <br />Resources), University of <br />Pressure Gradient (WSPGW) Software, XP-Solutions Storm Water and <br />California at Irvine <br />Wastewater Management Model (XP-SWMM), AutoCAD Civil 3D, and ArcGIS. <br />B.S. - Civil Engineering, <br />She has worked for projects in the County of Los Angeles, County of Orange, and <br />San Bernardino County. The projects she has been involved with are both in the <br />California State <br />private and public sector. In the private sector she worked on projects for <br />University, Long Beach <br />developers including Rancho Mission Viejo and the Irvine Company. Her public <br />Year of TAIT Team <br />sector experience includes working on projects for the County of Orange, the <br />Enlistment <br />City of Rancho Palos Verdes, the City of Chino, the City of Chino Hills, and the <br />2017 <br />City of Santa Ana. She is an out of the box thinker with great energy and a hard <br />working ethic. She has great communication, writing, organizational and <br />Total Experience <br />leadership skills. <br />Rancho Mission Viejo Planning Area 3 Runoff Management Plan, Rancho <br />Certifications <br />Mission Viejo, LLC, Project Engineer, 2015-2017 <br />Professional Engineer, <br />Task managed the hydrology and hydraulics portion for the initial phases of the <br />California No. C86581 <br />Planning Area (PA3) Runoff Management Plan (ROMP) for Rancho Mission Viejo, <br />The PA3 ROMP is a comprehensive watershed planning document that supports <br />Affiliations <br />the future design and planning within PA3. The primary focus of this study is to <br />American Society of Civil <br />provide a framework for the implementation of the project drainage patterns <br />Engineers (ASCE), OC <br />and storm water management facilities. Updated the hydrology models using <br />YMF <br />the Advance Engineer Software (AES) forthe Rational Method and the Unit <br />Hydrograph models following the Orange County Hydrology Manual <br />requirements and the unique modeling procedures for the San Juan Creek <br />Watershed. Prepared studies for flood control and water quality regional basin <br />analyses and studied alternatives to optimize the basin location and sizes. <br />Rancho Palos Verdes Storm Drain Repair, City of Rancho Palos Verdes, Project <br />Engineer, 2016-2017 <br />Prepared the hydrologic and hydraulic analyses using a hydrodynamic modeling <br />approach in XP-SWMM. Identify and analyzed the storm drain systems that were <br />determined hydraulically deficient per the 2015 Master Plan of Drainage. <br />Completed street flooded width calculations and catch basins sizing analysis <br />using FlowMaster. Prepared the Basis of Design Report forthe proposed <br />improvements satisfying the client's time constraints and goals. <br />�II TAIT _ Appendix Page 131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.