My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS-A-2020-076-03
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS-A-2020-076-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:51:49 AM
Creation date
5/6/2020 4:23:23 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-076-03
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and quality control to help meet the challenges <br />of your projects. Timely project delivery, fewer <br />change orders, comprehensive documentation, <br />coordination with the community, working with <br />permitting agencies, and creating a safe working <br />environment will all contribute to these objectives. <br />Psomas uses a number of tools for cost, <br />schedule and document control, including state- <br />of-the-art contract management software and a <br />standard company CM Procedures Manual used <br />on all projects. In addition, we have a cloud - <br />based internal accounting system that provides <br />our project managers with real-time resource <br />planning and project cost accounting. <br />Scope Control <br />Psomas recognizes that defining the project <br />scope is a critical first step in controlling cost <br />and schedule. Establishing a detailed and <br />well researched project scope during Task <br />Order development is key to this process. <br />Communicating any out -of -scope elements that <br />may arise during the course of the project as a <br />result of unforeseen issues or newly adopted <br />regulatory or agency requirements is essential <br />to keep City staff informed and eliminate any <br />surprises during the later stages of the project. <br />Cost Control <br />Psomas values <br />efficiency in time <br />utilization and cost <br />management. The <br />City has constraints <br />requiring you to <br />stretch as much as <br />you can out of every <br />dollar. Psomas is <br />conscientious about <br />manpower and <br />tracking utilization <br />and forecasting <br />workload to reduce <br />our workforce to <br />our Project at a Glance that will allow you to <br />receive accurate timecards and records that are <br />needed for approving invoices. <br />Schedule Control <br />As trusted stewards of tax dollars, Psomas <br />understands the importance the City places <br />on meeting project deadlines. Psomas will <br />proactively anticipate and address delays at the <br />lowest possible cost to verify the overall work is <br />unaffected to keep the project on schedule. In <br />addition to reviewing the contractor's schedule, <br />Psomas prepares and maintains "as -built" <br />schedules. The "as -built" schedules are updated <br />weekly with the contractor's activities. This is an <br />essential tool in negotiating change orders and <br />analyzing time extension requests, helping the <br />City make key decisions to accelerate project <br />progress. <br />Psomas utilizes Microsoft Project and Primavera <br />P6 to develop a CPM schedule for projects, <br />generating a variety of reports, including <br />milestone reports, subcontractor detail, critical <br />path analysis, cost/resource loaded schedules, <br />cash flow projections, logic diagrams, and short <br />interval schedules (three-week look -ahead <br />schedule) for upcoming work. Time control <br />reporting monitors the progress of all activities <br />Construction Management QATATRACKING <br />fib <br />xFa em.um�ni...r: — � •.�. <br />coincide with project I'm <br />requirements. Reuben will staff your <br />projects with the right team at the right level to <br />deliver a project in a timely manner and ensure <br />the budget is managed efficiently. Psomas also <br />practices internal cost control measures including <br />Document Control <br />against the master <br />schedule, including <br />design reviews, <br />the permit process, <br />and the various <br />tasks associated <br />with design and <br />construction <br />services. This <br />information is <br />tracked on a regular <br />basis to measure <br />progress, verify <br />proper planning, <br />and prevent <br />potential problems <br />and conflicts. <br />Proper management of construction documents, <br />RFIs, submittals and CCOs is an important factor <br />in successful construction projects and to confirm <br />P S 0 M A S RFP No 19 113 I city of soma Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.