My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS-A-2020-076-03
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS-A-2020-076-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:51:49 AM
Creation date
5/6/2020 4:23:23 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-076-03
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
funding. Document control is even more critical <br />as the project team expands beyond the client <br />and the designer to include consultants, trade <br />contractors, and local and state agencies that <br />may have jurisdiction over the project. <br />Psomas utilizes proven methods to make sure <br />time -sensitive documents move quickly and <br />issues are resolved before delays become a <br />factor. Our on-line Construction Management <br />Data Tracking System (CM-DTS) is a 100% web - <br />based system built by construction managers for <br />construction managers. <br />CM-DTS emphasizes automated reporting <br />and real-time secure access for everyone on <br />the project team. The software simply helps <br />you exchange and track important information, <br />allowing you to manage the construction process <br />as efficiently as possible. <br />CM-DTS can be accessible by all approved team <br />members with simple access to the Internet, <br />via Microsoft Internet Explorer (with appropriate <br />security, of course). The City can benefit directly <br />by having the ability to review the documents and <br />determine status of any piece of documentation <br />throughout the progress of the work. It is capable <br />of automatically generating transmittals and/ <br />or emails and logging transactions in one step, <br />allowing our staff <br />to be much more <br />efficient. <br />This automation <br />improves the level <br />of documentation <br />and allows our staff <br />to focus more on <br />being proactive <br />and effective at <br />the other aspects <br />of the project. <br />We can easily <br />generate reports <br />summarizing the <br />status of any of our logs for regular or impromptu <br />meetings. Documents can be viewed within the <br />customizable document directory <br />(e.g., daily diaries, meeting minutes, and photos). <br />In establishing a document control approach <br />for your program, Psomas starts with CM-DTS <br />(or the City's preferred system) to manage <br />documents. Psomas will develop a combination <br />hard copy and electronic master files archive <br />for your program to allow access to project <br />documents. Psomas is capable of adapting to <br />meet your document control requirements. <br />Optional Services <br />(Technical/Procedural Innovations) <br />Safety Risk Review Prior to the Start of <br />Construction <br />Although site safety is the primary responsibility <br />of the contractor, it is a paramount practice at <br />Psomas that all people come in contact with <br />us and our projects remain safe. Many of the <br />City's projects who are located in urban areas, <br />thus the safety of both the public and workers is <br />paramount. <br />Starting to look at safety after the work has <br />started may not be the most proactive approach <br />to take. We believe the best time to do a safety <br />analysis is prior to the start of construction when <br />the risk to health and safety is not present. This <br />is why Psomas offers the services of our Safety <br />Officer to visit a project site, meet with the key <br />team members, and perform a Safety Risk <br />Assessment. In an effort not to dictate means <br />and methods to the <br />selected contractor, <br />it would be best to <br />try and incorporate <br />this information into <br />the specifications <br />prior to bidding the <br />project. Psomas' <br />Safety Advisor <br />would deliver his <br />finding in a report <br />that could easily be <br />incorporated into the <br />specifications. <br />W9701 7 <br />The use of LiDAR to control project costs is <br />something only the Psomas team can offer. <br />We have the only local LiDAR Scanning <br />vehicle in Southern California, as well as the <br />technical staff needed to read and translate <br />RrP No.19.118 = --.. - -- - -, I I _ I . _ . city of Santa Ana PSOMAS <br />
The URL can be used to link to this page
Your browser does not support the video tag.