My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS-A-2020-076-03
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS-A-2020-076-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:51:49 AM
Creation date
5/6/2020 4:23:23 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-076-03
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the data. Some of the <br />things the use of LiDAR <br />allows the Construction <br />Management Team to do <br />include: <br />• Better manage the <br />contractors' quantities <br />■ Confirm the proper <br />amount of base is used <br />rather than additional <br />asphalt <br />• Confirms proper <br />excavation <br />■ Provide millions of <br />additional data points <br />than traditional survey <br />for better as -built <br />information <br />'4'.'S `,.7.Y ".. 'J' aO •O u. +Y.' 't)"" � n. ice-. A>l__'� <br />w <br />s + <br />■ Confirms as -bid conditions prior to construction <br />Innovative Daily Reports <br />Daily reports are the single most important <br />document a construction management team can <br />produce on a project. Daily reports can protect <br />the City and verify the contractor is completing <br />the work per the plans and specifications. One <br />innovative thing Psomas has added to our daily <br />reports is the inclusion of marked -up plan sheets <br />that reference the work done for that particular <br />day. The image above illustrates this innovation. <br />Assumptions and Exclusions <br />Psomas has no assumptions and/or exclusions. <br />RELEVANT PROJECT <br />EXPERIENCE <br />Below is a list of projects that have been <br />completed by Psomas in the last five years, <br />which includes work with Public Agencies. <br />Rehabilitation of West Garden <br />Grove Well 22/13ooster Pumping <br />Facility <br />Garden Grove, CA <br />This project began with a preliminary <br />investigation of the existing facility. The <br />preliminary investigations included a four -day <br />condition assessment of the existing facility; <br />hydraulic testing of three booster pumps and <br />one well pump; well production and efficiency <br />testing; vibration testing of the pumping and <br />engine equipment; efficiency testing of natural <br />gas engines; and coordination with AQMD <br />for revisions to existing air quality permit. A <br />Preliminary Design Report was prepared which <br />PSOMAS RPP No. 19.11a , 1, _. _- . _, City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.