Laserfiche WebLink
Jeffrey Palin, PE, asp <br />Construction Manager <br />REGISTRATION <br />2007/CA/ P rofe s s i o n a l <br />Engineer/C i v i I /#70832 <br />EDUCATION <br />2000/BS/Civil and <br />Structural Engineering/ <br />British Columbia Institute <br />of Technology <br />CERTIFICATION <br />American Society of Civil <br />Engineers <br />EXPERIENCE <br />With Psomas for 1 year: <br />with other firms for 17 <br />years <br />Jeffrey Palin is a seasoned professional with over 18 years of wide <br />ranging experience in the civil engineering and construction fields. <br />His experience includes engineering design, project management, <br />construction management, and director level employee management. <br />Jeff brings a client first mentality on all projects with an emphasis on clear <br />and concise communication between client, contractor, and impacted <br />stakeholders. He has proven ability to break down complex projects into <br />manageable components. He also is exceptionally adept at problem <br />solving and communicating solutions to project teams, as well as having a <br />consistent record of maintaining schedules and minimizing change orders. <br />Experience <br />Airport Neighborhood Sewer Improvement, County of Stanislaus, <br />CA: Project Manager/Resident Engineer for installation of 1,700 LF of <br />new 8-inch sewer trunk line and 1,400 LF of new 6-inch collector line with <br />corresponding manholes and services. It also included regrading and <br />complete paving of the affected streets. <br />San Benito Avenue Sanitary Sewer Rehabilitation Project, County <br />of San Mateo, CA: Project Manager/Construction Manager for pipe <br />bursting, lining, and open cut construction. Additional elements included <br />replacement of approximately 600 feet of existing 6-inch VCP sanitary <br />sewer main with 6-inch HDPE by pipe -bursting method, reconnecting <br />approximately 22 existing active sewer laterals to new sewer mains, and <br />replacing five existing sanitary sewer manholes. Change orders were 2.3 <br />percent. The County requested immediate assistance for this fast -tracked <br />project, which was successfully delivered. Met with the Contractor one day <br />after receiving the call from the County. Successfully split time between <br />this project and other assignment, responding to the needs of both clients. <br />Fair Oaks Sanitary Maintenance District (FOSMD), Interceptor Flow <br />Metering Station Rehabilitation, County of San Mateo, CA: Project <br />Manager/Construction Manager for retrofitting an existing sanitary sewer <br />flow metering station for the Fair Oaks Sewer Maintenance District. Work <br />involved removal and replacement of an existing non-functioning flow <br />meter and corresponding 16-inch diameter piping using a temporary <br />bypass system. This, combined with logical construction phasing, allowed <br />critical sanitary sewer flow to continue throughout the project. The <br />concrete in both the metering station and the existing junction structure <br />was rehabilitated and coated with a two-part epoxy system. Other work <br />included constructing a concrete floor with new safety grating in the <br />junction structure, installing a new flap gate in an upstream manhole, <br />installing a new sump pump in the flow meter structure, and installing a <br />new rectangular weir structure and sluice gate. <br />Fairview Substation Project, Silicon Valley Power, CA: Construction <br />Manager for detailed management of complex conduit and wiring <br />schemes, strict tracking of vendor fabrication and deliveries, and the <br />removal of 8,000 CY of Class 11 contaminated soil (metals). <br />PSOMAS RFPNo. 19-118 1 al=i ,r �',,1, , —_I P.Iir it t,I- I[,- City of Santa Ana <br />