Laserfiche WebLink
Everett Butcher, PE, LEED AP <br />Construction Manager <br />REGISTRATION <br />2007/CA/General <br />Cc ntracto r/A&B/#904632 <br />200 3/CA/P rofe ss i o n a l <br />Engineer/C iv i I/#6 5620 <br />2002/CA/Professional <br />Engineer/ <br />Mechanical/#32081 <br />EDUCATION <br />1989/MS/Civil <br />Engineering/University of <br />Illinois, Urbana <br />1977/BS/Ocean <br />Engineering/ <br />Massachusetts Institute <br />of Technology <br />CERTIFICATIONS <br />LEED Accredited <br />Professional/U.S. Green <br />Building Council <br />EXPERIENCE <br />With Psomas for 5 years; <br />with other firms for 28 <br />years <br />Everett Butcher has over 30 years of experience in providing project <br />management services for large civil engineering construction projects. <br />His background includes program and project development and <br />execution for land development, planning, contracting, construction, <br />environmental, public works, transportation, and utilities. <br />Experience <br />City of Hermosa Beach On -Call Project and Construction <br />Management Services, Hermosa Beach, CA: Project Manager for <br />various state and federally funded capital improvement projects for the <br />City of Hermosa Beach. Services included consultant selection and <br />management, complete project management from planning through <br />construction phase services, bond and grant management, bid and award <br />services, construction management and inspection, and project close-out. <br />Capital improvement projects included Pier Renovation Phase III, Aviation <br />Street Tree Project, Pier Clock Barrier, Pier Concrete Deck Treatment, <br />Manhattan Avenue Street Improvements, Pier Avenue and North Parking <br />Structure Restriping, Beach Restroom Rehabilitation, Community Center, <br />Various Street Improvements, and Police Department HVAC Upgrades. <br />City of Long Beach, Demolition of the Existing Belmont Pool <br />Facility, Long Beach, CA: Construction Manager for construction <br />management services for the demolition of the existing Belmont Pool <br />facility. Demolition of the facility was in preparation of the new facility. <br />Demolition activities included salvage of select items from the facility, <br />removal and disposal of hazardous building materials, protection of <br />mature growth trees and grass area in the park to the north of the facility, <br />rough grading and finish grading of building site, and restoration of park <br />irrigation and landscaping. <br />Alamitos Avenue Rehabilitation Between 7th Street and Orange <br />Avenue, Long Beach, CA: Resident Engineer for this $1.3 million <br />project which was 4,700 feet long and included the repair and <br />replacement of various existing Portland Cement concrete (PCC) <br />improvements (sidewalk, curb and gutter, curb ramps, driveways, alley <br />entrances, cross gutters, other). Construction also included grinding PCC <br />and asphalt concrete pavement and overlay with AC (2,400 tons) and <br />asphalt rubber hot mix (ARHM) (3,000 tons) as well as minor traffic signal <br />modifications and upgrades and signing and striping. <br />Orange Avenue Improvements between 52nd, Long Beach, CA: <br />Construction Manager for this $2.3 million project which was 7,750 feet <br />long and trimming and root shaving, the removal of 29 trees, repair and <br />replacement of existing PCC improvements including sidewalks, curb <br />and gutters, and 70 curb ramps, and the replacement of old signals. <br />Construction also included grinding PCC and AC pavement and overlay with <br />AC (3,000 tons) and asphalt rubber hot mix (ARHM) (5,000 tons) as well as <br />minor traffic signal modifications and upgrades and signing and striping. <br />I .'Ili I -_-- - 1_1ICAofSanljka PSOMAS <br />