Laserfiche WebLink
d. Understanding the Need <br />Project Understanding <br />The City of Santa Ana is seeking qualified professional consultants to provide construction management <br />and inspection services for a variety of Capital Improvement Projects (CIP) and Rehabilitation & <br />Replacement (R&R) on an on -call basis. <br />Our Willdan staff understands that the approach to providing services for assignments under an on -call <br />program can be very different from those provided for stand-alone projects. Success in working with <br />this type of contract is dependent upon understanding a variety of elements that may be encountered, <br />such as. <br />• Short project durations and minimal lead times for assignments may be required <br />• Flexibility in service assignments, understanding work to date, and coordinating completion of project <br />tasks already started by agency staff is crucial <br />• Availability of our staff to the work assignment as it develops is often critical to moving that project <br />forward <br />• Efficient use of resources is important for project assignments that are relatively small <br />• Consistent, organized project management is vital due to the potentially large numbers of projects <br />that may be in process <br />• Regular attention to quality assurance and control is particularly important as short-term projects may <br />limit the number of interim review steps often associated with a project -specific contract <br />• Project demands can fluctuate resulting in additional or reduced deployment of staff. <br />Based on our past experience, we know how to efficiently dovetail into a project schedule with a <br />short lead time, assign appropriate staff, and complete the task successfully. Our history of working <br />with on -call contracts has well prepared our staff to respond to all requests by the City in a positive and <br />efficient manner. Willdan will manage all task orders with a "can do" attitude towards time and cost- <br />effective design services. Our project management and coordination philosophy revolves around early <br />and frequent communication with the project team members, including client staff and project <br />stakeholders. <br />Regulatory Agency Compliance <br />Willdan is thoroughly familiar with regulatory agency permitting requirements and environmental, design, <br />and construction procedures and requirements for projects within Caltrans's right-of-way. Although each <br />project may encompass different components and requirements, the general process remains the same <br />— following the Caltrans Local Assistance Procedures Manual (LAPM). Over 26 years ago, Willdan <br />adopted Caltrans' Construction Manual as our in-house standard and has incorporated Caltrans' <br />prescribed standards and procedures into our everyday inspection routine. Our inspectors possess <br />strong familiarity and in-depth knowledge of: <br />• State of California (Caltrans) Design Manuals, Standard Plans, and Standard Specifications <br />• State of California (Caltrans) Manual of Uniform Traffic Control Devices (MUTCD) <br />• State of California (Caltrans) Local Assistance Procedures Manual <br />• Standard Specifications for Public Works Construction (Greenbook), BNi <br />• Standard Plans for Public Works Construction, BNi <br />Federal Grant Administration and Compliance <br />Willdan is thoroughly familiar with regulations pertaining to expenditures of federal, state, county, and <br />local funds, including AHRP, STPL, RSTP, SAFETEA-LU, CDBG, HBP, HES, HSIP, and various other <br />grant and funding sources. <br />We have processed numerous permits and approvals through FHWA, CPUC, FRA, CTC, CCC, CDFW, <br />RWQCB, etc. We are familiar with funding, permitting, and procedural requirements of these agencies <br />F p? 9 , 1' _ s'or Water Resources <br />1, s utrnicho 3 blanagem [ and Inspection Services <br />EFT <br />