Laserfiche WebLink
procedures; procedures for preparing calculations, drawings, and reports; and procedures for logging, <br />disseminating, and filing correspondence, meeting minutes, and other project -specific documentation. <br />The work plan incorporates our standard procedures for document control and recordkeeping. Our staff <br />knows the importance of accurate documentation to ensure the City's liability is protected. Applying a <br />uniform standard of excellence is the only way to ensure documents are written and filed appropriately <br />for effective claims avoidance and/or mitigation and resolution. <br />e. Relevant Project Experience <br />The summary project profiles below highlight recent projects completed by Willdan for which construction <br />management and/or construction inspection services were provided within the last 5-years. These <br />projects demonstrate the depth of services and variety of project types in which Willdan has participated. <br />Client: City of Santa Monica Contact: Carlos Rosales, CIF <br />Year Completed: 2019 (310) 458-8701 <br />Willdan provided construction management and inspection for the project, <br />which included installation of over 4,800 LF of 8" and 12" water main, gate <br />valves, fire hydrants, and other appurtenant work 17th Street, Ocean Park <br />Blvd, Ocean Avenue, Ashland Avenue, and Grant Avenue. This project was <br />funded by the U.S. EPA Grant. Procore software was used for tracking <br />submittals, RFls, and change order requests. <br />Client: City of South I <br />Year Completed: 2018 <br />anager <br />Contact: Chris Castillo, Water Division Manager <br />(323)563-5790 <br />Willdan provided construction management, inspection, material testing, deputy <br />inspections, and labor compliance services for the Elizabeth Reservoir and <br />Booster Pump Station at the Well No. 28 site, and the new Well No. 29, at the <br />Santa Fe Tank Site. The $10 million project included construction of a new 1.8- <br />million-gallon reservoir and booster pump station; seismic retrofit of an existing <br />elevated tank; drilling and equipping of a new well; 10,000 LF of water distribution <br />main and appurtenances; street resurfacing; and other pertinent site <br />improvements. Willdan's construction management and inspection team ran <br />weekly construction meetings with the City and contractor; reviewed, logged, and <br />processed all submittals, RFls, drawing revisions, and change orders; coordinated <br />all building department inspections; and provided all public work inspection and <br />special inspections. <br />Client: City of Brea Contact: Raymond Contreras, Public Works <br />Department Administrator <br />Year Completed: Projected 2020 (714) 990-7763 <br />Willdan is providing construction management and inspection services for <br />the City's Alley Project No's. 7315, 7316, 7317, and 7461. Project No. 7315 o�_r <br />involves rehabilitation of an alley east of Redwood Ave, including <br />reconstruction of the asphalt pavement, concrete pavement, curb, and two <br />driveways. Project No. 7316 involves the rehabilitation of an alley East of <br />Puente St, including reconstruction of the asphalt pavement, concrete <br />pavement, 4-foot-wide longitudinal gutter, and driveway. Projects Nos. 7317 & 7461 involves the <br />replacement of 5,500 linear feet of water mains and the rehabilitation of the commercial streets in the <br />Cliffwood Tract. The project also includes R&R of existing minor concrete improvements, and localized <br />4w/ Statement of Qualifications for Water Resources <br />15 <br />r. Construction Management and Inspection Services <br />