My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WILLDAN ENGINEERING (5)
Clerk
>
Contracts / Agreements
>
W
>
WILLDAN ENGINEERING (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 10:07:02 AM
Creation date
5/6/2020 4:25:42 PM
Metadata
Fields
Template:
Contracts
Company Name
WILLDAN ENGINEERING
Contract #
A-2020-076-02
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Destruction Year
2028
Notes
CTRAX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5 — Project Closeout <br />1. Review, finalize, and transmit the contractor's approved record drawings (as -built) to the City. <br />2. Schedule a final inspection with the City and applicable agencies; prepare, distribute, and inspect <br />corrections to the final punch list for completion; and recommend final acceptance. <br />3. Coordinate/assist with project commissioning and owner training <br />4. Finalize contract bid items, claims, change orders, and punch list items. <br />5. Assist City with stop notices and release of retention. <br />6. Prepare documentation for final payment to the contractor. <br />7. Provide a redline set of as -built plans and prepared as -built drawings in AutoCAD. <br />8. Provide memorandum of clearance to issue notice of completion. <br />9. Finalize and deliver all construction files to the City. <br />10. Complete documentation required by various funding sources and other regulatory authorities. <br />11. Attend post -construction debriefing meetings with City staff <br />12. Perform contractor evaluations and submit to City staff. <br />3. Fee Proposal <br />Willdan has submitted our Fee Proposal in a separate document per the City's RFQ. The Fee Proposal <br />includes Willdan's Standard Hourly Fee Schedule. <br />4. Certifications <br />The following pages contain the required forms: <br />• Attachment 3-1: Non -Collusion Affidavit <br />• Attachment 3-2: Non -Lobbying Certification <br />• Attachment 3-3: Non -Discrimination Certification <br />Statement of Qualifications for Water Resources <br />40/ 20 Constriction Management and Inspection Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.