Miscellaneous Alleys Projects and Cliffwood Industrial Park, City of Brea, CA. Project
<br />Manager/Construction Manager. Willdan is providing construction management and inspection services
<br />for the City's Alley Project No's. 7315, 7316, 7317, and 7461. Project No. 7315 involves rehabilitation of
<br />the alley east of Redwood Ave between Birch St. and Ash St, including reconstruction of the asphalt
<br />pavement, concrete pavement, curb, and two driveways. Project No. 7316 involved the rehabilitation of
<br />the alley East of Puente St, between Joyce Dr and Walling Ave, including reconstruction of the asphalt
<br />pavement, concrete pavement, 4-foot-wide longitudinal gutter, and driveway. Projects Nos. 7317 & 7461
<br />involve rehabilitation of streets and waterline improvements for the Cliffwood Industrial Tract, including
<br />replacement of approximately 5,500 linear feet of existing water mains and the rehabilitation and
<br />reconstruction of the commercial streets in the Cliffwood Tract. The project also includes the removal and
<br />replacement of existing damaged sidewalk, concrete curb and gutter, curb ramps, cross gutters, and
<br />localized AC pavement, along with the adjustment of existing utilities to grade, traffic signage and
<br />striping, traffic control, and all other improvements required to complete the project.
<br />Trunk Water Replacement on Potrero, Morongo, and Martin Roads, Morongo Band of Mission
<br />Indians, Banning, CA. Project Manager. Willdan provided design, construction management,
<br />inspection, and materials testing services for water system improvements that included 8,600 lineal feet
<br />of 16-inch DIP water pipeline to replace the failing PVC pipe, new hydrants, valves, blow -offs, air vacuum
<br />valves, and 14 tie-ins to existing connection points plus meter laterals
<br />Westside Water and Sewer Main Replacement Program Phase 1, City of South Gate, CA. Project
<br />Manager. Willdan provided construction management and public works observation services for the
<br />City's water and sewer main replacement project. The project included replacement of 1,000 LF of 12"
<br />DIP, 17,600 LF of 8" DIP, and 950 LF of 6" DIP water mains, and 450 LF of 12" VCP and 1,700 LF of 10"
<br />VCP sewer mains. Existing water mains were abandoned in place, while the existing sewer mains were
<br />removed from the trench and new mains installed in the same alignment. Total construction cost was
<br />approximately $4.5 million.
<br />Firestone at Paramount Intersection Improvements, City of Downey, CA. Project Manager. Wilidan
<br />provided construction management and inspection services for this $1.6 million construction project. The
<br />project included street widening at the intersection of Firestone Blvd and Paramount Blvd, the 2nd
<br />highest volume intersection within the City of Downey. The general nature of the work included raised
<br />medians, new curb gutter and sidewalk, driveway approaches, traffic signal replacement, landscaping
<br />and irrigation, ARHM paving, utility adjustments and striping.
<br />Old River Road Project, City of Downey, CA. Project Manager. Willdan provided construction
<br />management for the project. The project included the installation of several thousand feet of 8" ductile
<br />iron water line, water services, and other appurtenant work.
<br />Lakewood Boulevard Street Widening, City of Downey, CA. Project Manager responsible for overall
<br />oversight and scheduling of construction administration and inspection services for the project. The
<br />project involved installing 12" DIP potable water main, 8" DIP reclaimed water main, 24" RCP to new 28-
<br />foot catch basin, pedestrian lights, traffic signals; relocating utilities; removing curb, gutter, and sidewalk;
<br />and installing sidewalk with enhanced scoring and integral color -stamped ADA-compliant access ramps,
<br />landscaping with controls, bus stop, and asphalt paving with 2-inch ARHM cap.
<br />Paramount Boulevard Water System Improvements CIP 18-17, City of Downey, CA Project
<br />Manager. Willdan provided construction management and inspection services for the project. The
<br />project involved the installation of new ductile iron potable water main, gate valves, tees and bends,
<br />thrust blocks, and appurtenant fittings; installation of new fire hydrant assemblies, water service lines,
<br />meters and boxes; and other appurtenant work.
<br />_ / Statement of Qualifications- for V`later Resources
<br />*W' Appendix A —Resumes Constn.ction Management and Inspection Services