Miscellaneous Alleys Projects and Cliffwood Industrial Park, City of Brea, CA. Project <br />Manager/Construction Manager. Willdan is providing construction management and inspection services <br />for the City's Alley Project No's. 7315, 7316, 7317, and 7461. Project No. 7315 involves rehabilitation of <br />the alley east of Redwood Ave between Birch St. and Ash St, including reconstruction of the asphalt <br />pavement, concrete pavement, curb, and two driveways. Project No. 7316 involved the rehabilitation of <br />the alley East of Puente St, between Joyce Dr and Walling Ave, including reconstruction of the asphalt <br />pavement, concrete pavement, 4-foot-wide longitudinal gutter, and driveway. Projects Nos. 7317 & 7461 <br />involve rehabilitation of streets and waterline improvements for the Cliffwood Industrial Tract, including <br />replacement of approximately 5,500 linear feet of existing water mains and the rehabilitation and <br />reconstruction of the commercial streets in the Cliffwood Tract. The project also includes the removal and <br />replacement of existing damaged sidewalk, concrete curb and gutter, curb ramps, cross gutters, and <br />localized AC pavement, along with the adjustment of existing utilities to grade, traffic signage and <br />striping, traffic control, and all other improvements required to complete the project. <br />Trunk Water Replacement on Potrero, Morongo, and Martin Roads, Morongo Band of Mission <br />Indians, Banning, CA. Project Manager. Willdan provided design, construction management, <br />inspection, and materials testing services for water system improvements that included 8,600 lineal feet <br />of 16-inch DIP water pipeline to replace the failing PVC pipe, new hydrants, valves, blow -offs, air vacuum <br />valves, and 14 tie-ins to existing connection points plus meter laterals <br />Westside Water and Sewer Main Replacement Program Phase 1, City of South Gate, CA. Project <br />Manager. Willdan provided construction management and public works observation services for the <br />City's water and sewer main replacement project. The project included replacement of 1,000 LF of 12" <br />DIP, 17,600 LF of 8" DIP, and 950 LF of 6" DIP water mains, and 450 LF of 12" VCP and 1,700 LF of 10" <br />VCP sewer mains. Existing water mains were abandoned in place, while the existing sewer mains were <br />removed from the trench and new mains installed in the same alignment. Total construction cost was <br />approximately $4.5 million. <br />Firestone at Paramount Intersection Improvements, City of Downey, CA. Project Manager. Wilidan <br />provided construction management and inspection services for this $1.6 million construction project. The <br />project included street widening at the intersection of Firestone Blvd and Paramount Blvd, the 2nd <br />highest volume intersection within the City of Downey. The general nature of the work included raised <br />medians, new curb gutter and sidewalk, driveway approaches, traffic signal replacement, landscaping <br />and irrigation, ARHM paving, utility adjustments and striping. <br />Old River Road Project, City of Downey, CA. Project Manager. Willdan provided construction <br />management for the project. The project included the installation of several thousand feet of 8" ductile <br />iron water line, water services, and other appurtenant work. <br />Lakewood Boulevard Street Widening, City of Downey, CA. Project Manager responsible for overall <br />oversight and scheduling of construction administration and inspection services for the project. The <br />project involved installing 12" DIP potable water main, 8" DIP reclaimed water main, 24" RCP to new 28- <br />foot catch basin, pedestrian lights, traffic signals; relocating utilities; removing curb, gutter, and sidewalk; <br />and installing sidewalk with enhanced scoring and integral color -stamped ADA-compliant access ramps, <br />landscaping with controls, bus stop, and asphalt paving with 2-inch ARHM cap. <br />Paramount Boulevard Water System Improvements CIP 18-17, City of Downey, CA Project <br />Manager. Willdan provided construction management and inspection services for the project. The <br />project involved the installation of new ductile iron potable water main, gate valves, tees and bends, <br />thrust blocks, and appurtenant fittings; installation of new fire hydrant assemblies, water service lines, <br />meters and boxes; and other appurtenant work. <br />_ / Statement of Qualifications- for V`later Resources <br />*W' Appendix A —Resumes Constn.ction Management and Inspection Services <br />