City of Santa Ana RFP No. 19-118
<br />Michael D. Bustos, PE, ENV
<br />Deputy Director of Construction Management and Inspection
<br />Project Role: Resident Engineer and QA/QC Manager
<br />Profile Summary
<br />Education: BS, Civil Engineering (Magna CumLaude), California Polytechnic State University, San Luis Obispo
<br />Registration: Civil Engineer, California No. 73173
<br />Caltrans Resident Engineer Academy
<br />Envision Sustainability Professional, Institute for Sustainable Infrastructure
<br />E�x erience 119years -- --- -- _ --
<br />Mr. Bustos is responsible for design and construction management of projects such as roadway
<br />reconstructions, drainage improvements, pipelines, pavement rehabilitation, street improvements, and
<br />grading. Mr. Bustos has served as resident engineer for over a dozen federally- and state -funded
<br />projects over the last five years. He has gained valuable experience in on -site construction
<br />management, off -site construction administration, inspection, design, and plan checking during his 19
<br />years with Willdan.
<br />Relevant Project Experience
<br />Trunk Water Replacement on Potrero, Morongo, and Martin Roads, Morongo Band of Mission
<br />Indians, Banning, CA. Project Engineer/Construction Manager. Willdan provided design, construction
<br />management, inspection, and materials testing services for water system improvements that included
<br />8,600 lineal feet of 16-inch DIP water pipeline to replace the failing PVC pipe, new hydrants, valves,
<br />blow -offs, air vacuum valves, and 14 tie-ins to existing connection points plus meter laterals. Mr. Bustos
<br />served as Engineer of Record, responsible for preparation of plans, specifications, and estimate for
<br />construction of 16-inch water main on Porters, Morongo, and Martin Roads. Mr. Bustos also served as
<br />Construction Manager during construction, and was responsible for overseeing contract administration,
<br />materials testing, and public works observation.
<br />Elizabeth Reservoir, Booster Pump Station, and New Well No. 29, City of South Gate, CA.
<br />Construction Manager/Resident Engineer. Willdan provided construction management, inspection,
<br />material testing, deputy inspections, and labor compliance services for the Elizabeth Reservoir and
<br />Booster Pump Station at the Well No. 28 site, and the new Well No. 29, at the Santa Fe Tank Site. The
<br />$10 million project included construction of a new 1.8-million-gallon reservoir and booster pump station;
<br />seismic retrofit of an existing elevated tank; drilling and equipping of a new well; 10,000 LF of 6-inch, 8-
<br />inch, and 12-inch water distribution main and appurtenances; street resurfacing; and other pertinent site
<br />improvements. Willdan's construction management and inspection team ran weekly construction
<br />meetings with the City and contractor (including preparation of agendas and minutes); reviewed, logged,
<br />and processed all submittals, RFIs, drawing revisions, and change orders; coordinated all building
<br />department inspections; and provided all public work inspection and special inspections.
<br />Sewer Line, Repair, Replacement and Slip Lining Program - Phase 1, City of Ridgecrest, CA.
<br />Project Manager/Resident Engineer. Willdan was responsible for the evaluation, design, and preparation
<br />of construction documents and construction engineering for the replacement of 12,022 linear feet of
<br />sanitary sewer pipe. Willdan's design team reviewed available CCTV records to evaluate the conditions
<br />of the existing sanitary sewer line. Willdan then used the findings of the evaluation to determine which
<br />sections of the sanitary sewer and corresponding manholes could be repaired and which sections
<br />needed to be replaced. Willdan prepared the design and construction documents for Phase 1 of the
<br />City's new multiyear sewer rehabilitation and replacement program. The final construction project
<br />included 6,890 linear feet of sewer rehabilitation, 5,130 linear feet of sanitary sewer replacement, and the
<br />reconnection of 172 laterals with Brim style inserts. Mr. Bustos served as the Project Manager and main
<br />point of contact to the City for this contract and served as Resident Engineer during construction,
<br />responsible for oversight of Willdan's construction management inspection, contract administration,
<br />material testing, and labor compliance services.
<br />Statement of Qualifications for Water Resources
<br />401 Appendix A —Resumes Construction Management and Inspection Services