Laserfiche WebLink
City of Santa Ana RFP No. 19-118 <br />Michael D. Bustos, PE, ENV <br />Deputy Director of Construction Management and Inspection <br />Project Role: Resident Engineer and QA/QC Manager <br />Profile Summary <br />Education: BS, Civil Engineering (Magna CumLaude), California Polytechnic State University, San Luis Obispo <br />Registration: Civil Engineer, California No. 73173 <br />Caltrans Resident Engineer Academy <br />Envision Sustainability Professional, Institute for Sustainable Infrastructure <br />E�x erience 119years -- --- -- _ -- <br />Mr. Bustos is responsible for design and construction management of projects such as roadway <br />reconstructions, drainage improvements, pipelines, pavement rehabilitation, street improvements, and <br />grading. Mr. Bustos has served as resident engineer for over a dozen federally- and state -funded <br />projects over the last five years. He has gained valuable experience in on -site construction <br />management, off -site construction administration, inspection, design, and plan checking during his 19 <br />years with Willdan. <br />Relevant Project Experience <br />Trunk Water Replacement on Potrero, Morongo, and Martin Roads, Morongo Band of Mission <br />Indians, Banning, CA. Project Engineer/Construction Manager. Willdan provided design, construction <br />management, inspection, and materials testing services for water system improvements that included <br />8,600 lineal feet of 16-inch DIP water pipeline to replace the failing PVC pipe, new hydrants, valves, <br />blow -offs, air vacuum valves, and 14 tie-ins to existing connection points plus meter laterals. Mr. Bustos <br />served as Engineer of Record, responsible for preparation of plans, specifications, and estimate for <br />construction of 16-inch water main on Porters, Morongo, and Martin Roads. Mr. Bustos also served as <br />Construction Manager during construction, and was responsible for overseeing contract administration, <br />materials testing, and public works observation. <br />Elizabeth Reservoir, Booster Pump Station, and New Well No. 29, City of South Gate, CA. <br />Construction Manager/Resident Engineer. Willdan provided construction management, inspection, <br />material testing, deputy inspections, and labor compliance services for the Elizabeth Reservoir and <br />Booster Pump Station at the Well No. 28 site, and the new Well No. 29, at the Santa Fe Tank Site. The <br />$10 million project included construction of a new 1.8-million-gallon reservoir and booster pump station; <br />seismic retrofit of an existing elevated tank; drilling and equipping of a new well; 10,000 LF of 6-inch, 8- <br />inch, and 12-inch water distribution main and appurtenances; street resurfacing; and other pertinent site <br />improvements. Willdan's construction management and inspection team ran weekly construction <br />meetings with the City and contractor (including preparation of agendas and minutes); reviewed, logged, <br />and processed all submittals, RFIs, drawing revisions, and change orders; coordinated all building <br />department inspections; and provided all public work inspection and special inspections. <br />Sewer Line, Repair, Replacement and Slip Lining Program - Phase 1, City of Ridgecrest, CA. <br />Project Manager/Resident Engineer. Willdan was responsible for the evaluation, design, and preparation <br />of construction documents and construction engineering for the replacement of 12,022 linear feet of <br />sanitary sewer pipe. Willdan's design team reviewed available CCTV records to evaluate the conditions <br />of the existing sanitary sewer line. Willdan then used the findings of the evaluation to determine which <br />sections of the sanitary sewer and corresponding manholes could be repaired and which sections <br />needed to be replaced. Willdan prepared the design and construction documents for Phase 1 of the <br />City's new multiyear sewer rehabilitation and replacement program. The final construction project <br />included 6,890 linear feet of sewer rehabilitation, 5,130 linear feet of sanitary sewer replacement, and the <br />reconnection of 172 laterals with Brim style inserts. Mr. Bustos served as the Project Manager and main <br />point of contact to the City for this contract and served as Resident Engineer during construction, <br />responsible for oversight of Willdan's construction management inspection, contract administration, <br />material testing, and labor compliance services. <br />Statement of Qualifications for Water Resources <br />401 Appendix A —Resumes Construction Management and Inspection Services <br />