Laserfiche WebLink
Traffic Signal Linden and Riverside Avenues, City of Rialto, CA. Construction Manager. Willdan <br />provided professional construction engineering services for the subject project. The project included <br />traffic signal improvements at the intersection of Linden and Riverside Avenue, including the installation <br />of new ADA compliant ramps, curb returns, sidewalk, asphalt pavement, installation of new traffic <br />signals, and other appurtenant work. Willdan provided construction management and inspection services <br />on the project. <br />Towne Avenue Phase 2, (Lexington Avenue to Riverside Drive), City of Pomona, CA. Construction <br />Manager. This project involved providing construction management and observation for the City's street <br />improvement project. This project included minor concrete repairs, removal and replacement of existing <br />asphalt, cold milling, ARHM overlay, and other appurtenant items of work. Willdan also provided labor <br />compliance and material testing. This was an ARRA funded project. <br />2016117 Overlay Project No. 170804, City of Rialto, CA. Construction Manager. Willdan provided <br />construction engineering services for the 2016/17 annual street overlay project with the City of Rialto. <br />The street rehabilitation project included asphalt overlay to various streets throughout the City. <br />Arterial Street Resurfacing FY 2017, City of Paramount, CA. Construction Manager. Willdan provided <br />engineering design followed by construction observation and federal labor compliance monitoring and <br />enforcement for the resurfacing of arterial streets in the City of Paramount on Alondra Boulevard from <br />Gundry Avenue to Hunsaker Avenue and traffic signal modifications at various intersections. This project <br />was federally funded with FHWA/STPL funds and Caltrans administered. <br />Miro Way Improvements - Phase I Storm Drain, City of Rialto, CA. Supervising Public Works <br />Inspector. Mr. Brown provided oversight of Willdan's inspection staff. Willdan provide public works <br />inspection for the City's Miro Way Improvements, Phase I Storm Drain. The project involved the <br />installation of 10,000 LF of RCP, manholes, catch basins, and other appurtenant work. <br />Palos Verdes Drive North Rehabilitation, City of Rolling Hills Estates, CA. Public Works Inspector. <br />Willdan provided labor compliance, construction management, and construction inspection services for <br />the CDBG funded project for the rehabilitation of Crenshaw Boulevard to Rolling Hills Road. <br />Street Rehabilitation FY 2007-08, City of Rolling Hills Estates, CA. Willdan provided professional <br />engineering design, pavement engineering, monument restoration, utility coordination, contract <br />administration, and construction observation services for the City's street rehabilitation FY 2007-08 <br />project. The project included street overlay to prevent more serious and costly deterioration that may <br />lead to complete reconstruction. <br />Asphalt Concrete Overlay, City of Rolling Hills Estates, CA. Mr. Brown provided construction <br />observation services for this project. The project involved design, design survey, utility coordination, <br />monument restoration, contract administration, and construction observation services for the City's 2004- <br />05 Asphalt Concrete Overlay program. <br />Statement of Qualifications for Water Resources <br />���r/ Appendix A —Resumes Construction Po1anagement and Inspection Services <br />