Jason Brown
<br />Senior Public Works Observer IV
<br />Project Role: Construction Management and Public Works Observation Lead
<br />Profile Summary
<br />Education: Public Works Inspection, Fullerton Community Co/fie
<br />Registration: Construction Inspector, California No. 5510
<br />Caltrans Resident Engineer
<br />Experience: :28 years
<br />Mr. Brown serves as both a Construction Manager and Supervising Public Works Observer for Willdan.
<br />His duties include the inspection and management of large-scale public works improvement projects.
<br />His experience includes the construction administration and inspection of subdivisions, traffic signals,
<br />storm drains, sanitary sewers, ARHM overlay, conventional asphalt overlays, and street beautification
<br />projects. In addition, Mr. Brown has experience with specially funded projects, such as ISTEA and
<br />CDBG. During Mr. Brown's 28 years of experience with Willdan, he has served as a Permit Inspector for
<br />the Cities of Paramount, Bell Gardens, and Rosemead.
<br />Relevant Project Experience
<br />Paramount Boulevard Water System Improvements CIP 18-17, City of Downey, CA. Construction
<br />Manager. Willdan provided construction management and inspection services for this water system
<br />improvement project on Paramount Boulevard from Firestone Boulevard to Florence Avenue. The
<br />project involved the installation of new ductile iron potable water main, gate valves, tees and bends,
<br />thrust blocks, and appurtenant fittings; installation of new fire hydrant assemblies, water service lines,
<br />meters and boxes; and other appurtenant work.
<br />Tim Spencer Alley CM/Inspection, City of Davis, CA. Construction Manager. The project consisted
<br />of improvements within Tim Spencer Alley, including water main demolition, water main and sanitary
<br />sewer main installation, pavement resurfacing, CIP sewer main lining, temporary water sewer bypass,
<br />water sewer service installations, asphalt and concrete demolition, grading, PCC improvements, ADA
<br />compliant ramps, street furniture, landscaping and street lighting, and other appurtenant work.
<br />Imperial Highway Improvements, CB 17-18, City of Inglewood, CA. Construction Manager. This
<br />project involves the pavement rehabilitation and other street improvements of an approximate 1.5-mile
<br />segment of arterial roadway on Imperial Highway between Prairie Avenue and Van Ness Avenue. The
<br />project consists of traffic signal modifications at four major intersections; 7,000 LF of fiber optic conduit
<br />and cable; cold milling existing AC pavement; rubberized asphalt concrete overlay; removal and
<br />replacement of driveway approaches, sidewalks, curbs and gutter; ADA compliant curb ramps; AC
<br />pavement; PCC pavement; PCC bus pads; signing and striping; and other appurtenant work.
<br />Construction Management, District Nos. 3A & 3B, City of La Canada Flintridge, CA. Construction
<br />Manager. Willdan provided construction management and inspection services for the extension of a new
<br />sewer system to 1,600 homes, consisting of 100,000 feet of 8-inch sewer main and 47,000 feet of 6-inch
<br />laterals for District Areas 3A and 3B.
<br />Cedar SR2S Project, City of Rialto, CA. Construction Manager. Willdan provided construction
<br />management, inspection, material testing, and labor compliance services for the City's SR2S Project.
<br />The project included extensive street improvements, including construction of sidewalk, curb and gutters,
<br />and driveways; installation and/or relocation of signage; relocation of utilities; and other work as indicated
<br />in the specifications and plans.
<br />Slurry Seal on Various Streets FY 2018-19, City of La Puente, CA. Construction Manager. Willdan
<br />provided engineering design and project management services for the Slurry Seal Program on Various
<br />Streets FY 2018-19.
<br />Statement of Qualifications for Water Resources
<br />40/ Appendix A —Resumes Construction Management and Inspection Services
<br />
|