My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Require the contractor to maintain an updated <br />set of drawings, specifications, addenda, <br />bulletins, change orders, or other document <br />updates at the jobsite. Updates shall incorporate <br />modifications and changes from all sources such <br />as submittals, RFIs, field orders, etc. <br />• Process RFIs and assure timely distribution <br />to and response by appropriate project team <br />members (City staff, engineer, other agencies). <br />Response to RFIs shall take no longer than <br />seven (7) calendar days. We will coordinate all <br />technical support and constructability reviews <br />during preparation of responses to RFIs <br />and maintain an RFI log to track closed and <br />outstanding RFIs. <br />• Assure an efficient submittal process, beginning <br />with the contractor delivering a submittal <br />schedule for review within 10 calendar days after <br />the effective date of the construction contract. <br />NV5 will provide technical support during review <br />of the submittal schedule (and at a minimum <br />weekly thereafter) to assure compliance with <br />the contract documents and note any matters of <br />concern to the City, such as potential impacts to <br />schedule. We will monitor, process, and forward <br />for approval all submittals and assure timely <br />distribution to and review by appropriate project <br />team members City staff, engineer, and other <br />agencies). <br />• Review and recommend for approval the <br />contractor's CPM baseline schedule and, upon <br />acceptance, adopt for the remainder of the <br />project. Monitor work progress in accordance <br />with this baseline schedule on a daily, weekly, <br />monthly basis to assure the contractor maintains <br />all milestone and critical -path dates. Indicated <br />slippage will be addressed during the project <br />meetings and written reports. <br />• Review and respond to requests for <br />design revisions by the contractor. Provide <br />recommendations and forward all responses for <br />approval to the City and/or design engineer prior <br />to transmitting to the contractor. <br />• Coordinate evaluation of and provide <br />recommendations for "or -equal" or product <br />substitution requests with the design engineer, <br />City, vendors, manufacturers, and others. <br />• Initiate and review field orders when a change in <br />the work is needed to maintain the design intent. <br />We will issue field orders to the contractor and <br />monitor the work for compliance. Changes will be <br />logged and recorded in the record specifications <br />and plans. If required, we will follow-up with a <br />change order within 14 calendar days of mutual <br />agreement with the contractor on pricing and <br />conditions. <br />Receive, evaluate for reasonableness and <br />cost effectiveness, negotiate, and recommend <br />for approval any submitted change orders by <br />applying knowledge of prevailing wage rates, <br />material unit cost guide publications, quantity <br />take -offs, or other measures required in order <br />to substantiate and/or negotiate change orders. <br />Maintain a change order log to track executed <br />and potential change orders and monitor the <br />amounts against the total construction contract. <br />Develop a cost control system to monitor <br />actual versus estimated costs, differences will <br />be included in weekly status meetings. For <br />authorized work, accounting records will be <br />maintained using contract unit costs. For any <br />additional work, accounting records will reflect <br />actual costs of time and materials. <br />Review contractor(s) Safety Program for <br />compliance with City standards as well as any <br />OSHA regulations. Recommend contractor(s) <br />submit site -specific safety plans that identify the <br />risks and liability arising from specific operations <br />relating to the project. <br />Maintain a safe working environment. All NV5 <br />personnel will wear hard hats, safety vests, and <br />rubber -soled shoes at all times while on -site. <br />Create and maintain a daily account of all <br />construction activities. Request, review, analyze, <br />and use for reporting, the daily construction <br />reports as generated by the contractor(s). This <br />will be a vital source of information for identifying <br />and reviewing potential delays, weather impacts, <br />labor shortages, untimely deliveries of long <br />lead items, and other factors that can lead to <br />schedule and cost impacts. Adverse findings will <br />be included in weekly status meetings. <br />Review and forward for approval the contractor <br />payment applications. Conduct the monthly <br />"pencil draft" with the contractor to review <br />the progress to date and verify that payment <br />applications represent work in place and are <br />in compliance with the accepted SOW and the <br />requirements of the construction documents. <br />Once the payment applications are reviewed <br />
The URL can be used to link to this page
Your browser does not support the video tag.