My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACTINFO <br />DAVID LEDYARD <br />david.ledyard@nv5.com <br />949.585.0477 <br />Construction Inspector <br />p <br />.................................................................................................................................................................................... <br />EXPERIENCE <br />Mr. Ledyard has more than 36 years of engineering and construction <br />36 years <br />inspection experience. He has served as both a supervisory inspector, <br />EDUCATION <br />overseeing permit inspectors, as well as a lead inspector on various capital <br />A.A. Engineering <br />improvement projects, including street, sewer, water and storm drain <br />improvements. As construction inspector, Mr. Ledyard's responsibilities include <br />AVAILABILITY <br />site observation and construction quality assurance and control, ensuring <br />60% <br />general site safety, preparing daily reports, photo documentation, monitoring <br />SWPPP and BMP implementation, providing daily updates to the city project <br />manager, labor compliance and EEO interviews, providing recommendations <br />and responses for contractor RFls, assisting with submittal and shop drawing <br />reviews, tracking quantities, and assisting with the progress payment reviews. <br />Project Experience <br />.................................................................................................................................................................................... <br />Sewer Relining and Point Repair <br />CITY OF PASADENA I PASADENA, CA <br />Construction Inspector. Mr. Ledyard served as construction inspector for the <br />rehabilitation of more than 10,000 LF of existing 8-inch- and 10-inch-diameter <br />sewer mains. Specifically, the project included pipe lining and/or point repairs; <br />cleaning; pre -lining and post lining video inspections; removing and replacing <br />damaged sections of pipes; and installation of pipe liners. <br />Sewer Capacity Upgrades <br />CITY OF PASADENA I PASADENA, CA <br />Construction Inspector. Mr. Ledyard served as construction inspector for the <br />reconstruction of approximately 2,900 linear feet of sanitary sewer. The work <br />included the removal of existing 8-inch- to 10-inch-diameter sewer mains and <br />replacing them with 10-inch- to 18-inch-diameter mains; reconstructing existing <br />sewer manholes, and reconnecting existing house sewer laterals. <br />Eastside Well Collector Project <br />CITY OF PASADENA I PASADENA, CA <br />Construction Inspector. Mr. Ledyard served as construction inspector on this <br />$5M water improvements project. The scope of work included the installation <br />of approximately 4 miles of 16-inch, 20-inch, and 24-inch water mains along <br />Monte Vista Street, Craig Avenue, Foothill Boulevard, Sierra Madre Villa <br />Avenue and Sierra Madre Boulevard. The project also included connections to <br />an existing reservoir and six groundwater wells. He also was responsible for <br />permit coordination and plan reviews. <br />Lake Avenue Water Main Replacement Project <br />CITY OF PASADENA I PASADENA, CA <br />Construction Inspector. Mr. Ledyard served as construction inspector on this <br />$1.5M water improvement project. The scope of work included the installation <br />V <br />5 <br />of approximately 1 mile of 8-inch diameter water main line; installation of all <br />valves, hydrants and appurtenances; reconnection with existing adjacent <br />mains; and reconnection/reconstruction of existing water services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.