Laserfiche WebLink
objectives and schedule constraints, while at <br />the same time complying with applicable City <br />requirements. <br />Resumes for all personnel shown on the <br />Organization Chart are included as an <br />attachment and provided in Section 4, <br />Certifications/Resumes of the Proposal. <br />Krista Kausen, PE, ENV SP 15% <br />PROJECT ENGINEER -WATER <br />Ben Halbach, PE, ENV SP 15% <br />PROJECT ENGINEER -SEWER <br />Joseph gainers, EIT, ENV SP 20% <br />CIVIL DESIGN - WATER/SEW ER <br />Kimberly Alexander, PE 15% <br />PROJECT ENGINEER - <br />HYDRADLIC MODELING <br />Psomas <br />Organization Chart <br />An organizational chart identifying Psomas' <br />committed team for this On -Call Water <br />Resources Engineering Services contract, as <br />well as their roles and reporting relationships, <br />is included below. A blue diamond (•) delineates <br />the personnel who will act as Alternate Points <br />of Contact. <br />(a <br />Alternate Point of Contact <br />xx% Percent Dedicated to this Contract <br />---_� + Joseph Boyle, PE, ENV SP a% <br />Psomas <br />Malra Salcedo, PE, ENVSP 15% <br />PRIMARY POI NT OF CONTACT <br />WATERISEWER DESIGN <br />• Michael Swan, RE, ENV SP 10% <br />WATERISE WER PLANNING AND DESIGN <br />• Nancy Baker, PE, ENV SP 10% <br />WATER/SEWER DESIGN <br />Psomas <br />Christopher Riehle, PUS a% J David Watson, PE 5% <br />Psomas j Psomas <br />Subconsultant Support <br />Hernan Montoya, SE 10% Long Pham, PE, EE, CSE 10% <br />Arcon Structural Engineers, Inc. Spec Services, Inc. <br />Paul Mitchell, PE 5% <br />ADS Environmental Services <br />Earl LaPensee, PG, CH9 a% <br />Richard Slade & Associates <br />Jane Cataldo, 5% <br />RLA, ENV SP, LEED AP <br />Lynn Capouya, Inc. <br />John Robinson 5% <br />John Robinson Consulting <br />Jennifer Marks 2% <br />Psomas <br />All Bastani, 5% <br />PhD, PE, GE, F ASCE <br />GIVU Geotechnical <br />Chris Loera 5% <br />C Below <br />PSOMAS UP N3 19 100 init J A. a <br />